Araştırma Makalesi

Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study

Cilt: 32 Sayı: 7 27 Kasım 2026
PDF İndir
EN TR

Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study

Öz

Flexible Job Shop Scheduling (FJSS) demands fast, high-quality decisions under uncertainty and multiple, often conflicting objectives (e.g., makespan, tardiness, workload balance, energy, and cost). A modified Big Bang–Big Crunch (m-BBBC) algorithm and a hybrid GA–BBBC (HGA–BBBC) are developed and evaluated, combining GA’s recombination-driven exploration with BBBC’s contraction-driven intensification. The m-BBBC incorporates three mechanisms: (i) an adaptive convergence factor that balances exploration and exploitation across iterations; (ii) a fitness-weighted center of mass that steers the search toward high-quality regions; and (iii) a selective, workload-aware mutation that preserves feasible structure while restoring diversity. GA, m-BBBC, and HGA–BBBC are benchmarked on nine synthetic shop-floor scenarios (small/medium/large scales × light/medium/heavy loads), each with 30 independent trials, and on standard FJSP benchmark families (Brandimarte, Dauzère-Pérès and Paulli, and Fattahi). Performance is assessed on normalized criteria (higher is better) and analyzed using nonparametric statistics: the Friedman omnibus test with Nemenyi and Wilcoxon–Holm post-hoc procedures. An exact mixed-integer baseline solved with Gurobi is also used for small-scale instances to provide a commercial-solver reference. The m-BBBC achieves shorter computation times than GA and outperforms it on energy and total cost, whereas GA attains shorter makespan in some settings. The proposed HGA–BBBC closes most of the makespan gap to GA while retaining m-BBBC’s advantages in energy/cost and runtime, with the largest gains at medium and large scales. These findings support hybrid metaheuristics as effective, statistically validated approaches for dynamic, compute-constrained FJSS.

Anahtar Kelimeler

Kaynakça

  1. [1] Dauzère-Pérès S, Ding J, Shen L, Tamssaouet K. “The flexible job shop scheduling problem: A review”. European Journal of Operational Research, 314(2), 409-432, 2024.
  2. [2] Li X, Zhang Z, Sun W, Liu Y, Tang J. “Parallel dynamic NSGA-II with multi-population search for rescheduling of Seru production considering schedule changes under different dynamic events”. Expert Systems with Applications, 238, 121993, 2024.
  3. [3] Roshanaei V, Azab A, ElMaraghy H. “Mathematical modelling and a meta-heuristic for flexible job shop scheduling”. International Journal of Production Research, 51(20), 6247-6274, 2013.
  4. [4] Xia W, Wu Z. “An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems”. Computers & Industrial Engineering, 48(2), 409-425, 2005.
  5. [5] Ham AM, Cakici E. “Flexible job shop scheduling problem with parallel batch processing machines: MIP and CP approaches”. Computers & Industrial Engineering, 102, 160-165, 2016.
  6. [6] Samhouri M, Qareish SZ. “Hybrid fuzzy genetic algorithm for the integration of process planning and scheduling for distributed flexible job shop”. Neural Computing and Applications, 37(4), 2775-2798, 2025.
  7. [7] Zhang S, Li X, Zhang B, Wang S. “Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system”. European Journal of Operational Research, 283(2), 441-460, 2020.
  8. [8] Fattahi P, Saidi Mehrabad M, Jolai F. “Mathematical modeling and heuristic approaches to flexible job shop scheduling problems”. Journal of Intelligent Manufacturing, 18(3), 331-342, 2007.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Makine Mühendisliği (Diğer)

Bölüm

Araştırma Makalesi

Yazarlar

Bahram Lotfi *
TOBB Ekonomi ve Teknoloji Üniversitesi
Türkiye

Yayımlanma Tarihi

27 Kasım 2026

Gönderilme Tarihi

21 Eylül 2025

Kabul Tarihi

16 Mart 2026

Yayımlandığı Sayı

Yıl 2026 Cilt: 32 Sayı: 7

Kaynak Göster

APA
Lotfi, B. (2026). Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, 32(7), 1372-1395. https://doi.org/10.65206/pajes.58373
AMA
1.Lotfi B. Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi. 2026;32(7):1372-1395. doi:10.65206/pajes.58373
Chicago
Lotfi, Bahram. 2026. “Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 32 (7): 1372-95. https://doi.org/10.65206/pajes.58373.
EndNote
Lotfi B (27 Kasım 2026) Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 32 7 1372–1395.
IEEE
[1]B. Lotfi, “Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study”, Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, c. 32, sy 7, ss. 1372–1395, Kas. 2026, doi: 10.65206/pajes.58373.
ISNAD
Lotfi, Bahram. “Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 32/7 (27 Kasım 2026): 1372-1395. https://doi.org/10.65206/pajes.58373.
JAMA
1.Lotfi B. Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi. 2026;32:1372–1395.
MLA
Lotfi, Bahram. “Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, c. 32, sy 7, Kasım 2026, ss. 1372-95, doi:10.65206/pajes.58373.
Vancouver
1.Bahram Lotfi. Hybrid GA-BBBC and modified BBBC for flexible job shop scheduling: A nonparametric comparative study. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi. 27 Kasım 2026;32(7):1372-95. doi:10.65206/pajes.58373