Araştırma Makalesi

An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk

Cilt: 25 Sayı: 4 28 Ağustos 2019
PDF İndir
EN TR

An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk

Öz

In recent years, there has been a growing attention to model and solve resource-constrained project scheduling problem (RCPSP) under uncertain environments. In most of the real-life cases, project managers may face with many uncertainties in activity durations, resource availabilities, resource requirements of the activities, the earliest and latest finishing times of the activities etc. In addition to these input parameters, project schedule which represents the starting and/or completion times of the activities should also be considered as uncertain variables in such a fully uncertain environments where all of the project data are imprecise. Based on this motivation, this paper presents an interval programming based transformation approach to overcome fully uncertain nature of the problem. In detail, classical discrete-time binary integer programming model of the deterministic problem was extended by incorporating interval-valued parameters and decision variables. Then, fully uncertain RCPSP was transformed into the crisp equivalent form by making use of interval programming, interval ranking and interval arithmetic operations. In the proposed approach, interval arithmetic operations are performed by using supplementary information obtained from the project manager. Thus, the proposed approach is also able to take into account the project managers’ attitude toward risk and produces more acceptable and risk-free solutions. Finally, a real-life liquefied natural gas (LNG) storage tank construction project in a petroleum refinery is presented for testing its validity and practicality. The computational results have shown that more applicable and information efficient project schedules can be derived via the proposed approach according to the project manager’s attitude toward risk.

Anahtar Kelimeler

Kaynakça

  1. Chen Z, Demeulemeester E, Bai S, Guo Y. “Efficient priority rules for the stochastic resource-constrained project scheduling problem”. European Journal of Operational Research, 270(3), 957-967, 2018.
  2. Rostami S, Creemers S, Leus R. “New strategies for stochastic resource-constrained project scheduling”. Journal of Scheduling, 21(3), 349-365, 2018.
  3. Atli O, Kahraman C. “Fuzzy resource-constrained project scheduling using taboo search algorithm”. International Journal of Intelligent Systems, 27(10), 873-907, 2012.
  4. Atli O, Kahraman C. “Resource-constrained project scheduling problem with multiple execution modes and fuzzy/crisp activity durations”. Journal of Intelligent & Fuzzy Systems, 26(4), 2001-2020, 2014.
  5. Kahraman C, Kerre EE, Bozbura FT. Uncertainty modelling and in knowledge engineering and decision making. Proceedings of the 10th International FLINS Conference, Istanbul, Turkey, 26-29 August 2012.
  6. Subulan K. “Fully uncertain resource constrained project scheduling problem via interval programming: a real-life application in a LNG storage tank construction”. 2nd International Conference on Economics Business Management and Social Sciences, Belgrade, Serbia, 10-14 May 2017.
  7. Baykasoğlu A, Subulan K. “Constrained fuzzy arithmetic approach to fuzzy transportation problems with fuzzy decision variables”. Expert Systems with Applications, 81, 193-222, 2017.
  8. Baykasoğlu A, Subulan K. “A direct solution approach based on constrained fuzzy arithmetic and metaheuristic for fuzzy transportation problems”. Soft Computing, https://doi.org/10.1007/s00500-017-2890-2.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Mühendislik

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

28 Ağustos 2019

Gönderilme Tarihi

9 Ağustos 2018

Kabul Tarihi

-

Yayımlandığı Sayı

Yıl 2019 Cilt: 25 Sayı: 4

Kaynak Göster

APA
Subulan, K. (2019). An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, 25(4), 481-497. https://izlik.org/JA87NB25ZA
AMA
1.Subulan K. An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi. 2019;25(4):481-497. https://izlik.org/JA87NB25ZA
Chicago
Subulan, Kemal. 2019. “An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 25 (4): 481-97. https://izlik.org/JA87NB25ZA.
EndNote
Subulan K (01 Ağustos 2019) An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 25 4 481–497.
IEEE
[1]K. Subulan, “An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk”, Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, c. 25, sy 4, ss. 481–497, Ağu. 2019, [çevrimiçi]. Erişim adresi: https://izlik.org/JA87NB25ZA
ISNAD
Subulan, Kemal. “An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 25/4 (01 Ağustos 2019): 481-497. https://izlik.org/JA87NB25ZA.
JAMA
1.Subulan K. An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi. 2019;25:481–497.
MLA
Subulan, Kemal. “An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, c. 25, sy 4, Ağustos 2019, ss. 481-97, https://izlik.org/JA87NB25ZA.
Vancouver
1.Kemal Subulan. An interval programming based approach for fully uncertain resource-constrained project scheduling problem considering project manager’s attitude toward risk. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi [Internet]. 01 Ağustos 2019;25(4):481-97. Erişim adresi: https://izlik.org/JA87NB25ZA