In this study, modeling with time series analysis was done method by using date of monthly road traffic accidents (RTAs) occurred between1977-2006. According to results of analysis and date in period of this study, it was determined that ARIMA(4,1,4) was the best model. In the study monthly accident number are forecasted by appropriate model for 2006: 1-2007: 12 periods. Regression curve is drawn by using the estimated and actual number of RTAs and the correlation coefficient (r = 0.9163) were determined. A strong positive relationship was determined between estimated values and actual values. In addition, the success measure of ARIMA(4,1,4) model was identified by calculating value of root mean square errors (RMSE). It was determined that occur up to a traffic accident in December, October and November, at least a traffic accident in February, March and April
Road traffic accidents Temporal analysis Time series analysis.
Bu çalışmada 1977-2006 yılları arasında meydana gelen aylık trafik kaza verileri(şehir içi ve şehir dışı toplamı) kullanılarak zaman serisi analiz yöntemi ile modelleme yapılmıştır. Yapılan analizler sonucunda çalışma döneminde kullanılan verilere göre en uygun modelin ARIMA(4,1,4) olduğu belirlenmiştir. Çalışmada en uygun model kullanılarak 2006: 01-2007: 12 dönemi için aylık kaza tahmini yapılmıştır. Tahmin edilen ve gerçek kaza değerleri kullanılarak regresyon eğrisi çizilmiş ve korelasyon katsayısı (r=0,9163) belirlenmiştir. Tahmin değerleri ile gerçek değerler arasında güçlü pozitif ilişki olduğu belirlenmiştir. Ayrıca ARIMA(4,1,4) modelinin başarı ölçütü ortalama karesel hataların karekökü (OKHK) değeri hesaplanarak belirlenmiştir. Çalışma dönemi boyunca en fazla trafik kazası Aralık, Ekim ve Kasım aylarında, en az trafik kazası Şubat, Mart ve Nisan aylarında meydana geldiği belirlenmiştir.
Birincil Dil | Türkçe |
---|---|
Bölüm | Makale |
Yazarlar | |
Yayımlanma Tarihi | 1 Mart 2012 |
Yayımlandığı Sayı | Yıl 2012 Cilt: 18 Sayı: 3 |