Araştırma Makalesi

Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method

Cilt: 27 Sayı: 1 29 Şubat 2024
PDF İndir
TR EN

Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method

Öz

In the successful maintenance of electricity generation management processes in power generation plants, it is of great importance to determine the risks that may arise during the operation of the relevant processes, take measures to minimize these risks, and take the necessary actions. In this study, common risks in the electricity generation management process in HEPPs were identified and these risks were rated by experts (decision-makers) within each power plant itself. Since this rating is made by the experts of each power plant, the impact and probability values of the same risk may differ, and accordingly, different risk levels may arise for the same risk. In the study, the SWARA method was used to compare the risk levels of common risks in the electricity generation process in different power plants and calculate the final weight values of the related risks. As a result of the measures determined for each risk in the electricity generation management processes in the power plants and the actions taken for these measures, it was determined whether the relevant risks were reduced to acceptable levels by looking at the results of the internal audits. In the internal audits, the performance of HEPPs in eliminating the related risks is evaluated with fuzzy expressions separately for each risk. The risk weight values obtained by the SWARA method and the fuzzy expressions obtained as a result of the risk assessment were analyzed with the Fuzzy TOPSIS method, and the performance values of the power plants in eliminating the risks were calculated, then the performance ranking was made in the light of these values.

Anahtar Kelimeler

Kaynakça

  1. [1] Butt J., “A Conceptual Framework to Support Digital Transformation in Manufacturing Using an Integrated Business Process Management Approach”, Designs, 4:3, (2020).
  2. [2] Zileli Y. A. and Ersoy A. S., “Bulanık Dematel Tabanlı Analitik Ağ Süreci İle Bir Risk Yönetim Modelinin Geliştirilmesi”, Akademi Sosyal Bilimler Dergisi, 6:18, 418-443, (2019).
  3. [3] Akçakanat Ö., “Kurumsal Risk Yönetimi Ve Kurumsal Risk Yönetim Süreci”, Visionary E-Journal/Vizyoner Dergisi, 4(7), (2020).
  4. [4] Ertan Y., Arsoy A. P. and Kılınçarslan T. B., “Kurumsal Risk Yönetimi Olgunlaşma Seviyesinin Finansal Performansa Etkisi: Türkiye Örneği”, Muhasebe ve Finansman Dergisi, 76, 139-156, (2017).
  5. [5] Kim M. S., Lee E. B., Jung I. H. and Alleman D., “Risk Assessment and Mitigation Model for Overseas Steel-Plant Project Investment with Analytic Hierarchy Process—Fuzzy Inference System”, Sustainability, 10:12, 4780, (2018).
  6. [6] Kul Y., Şeker A. and Yurdakul M., “Bulanık Çok Kriterli Karar Verme Yöntemlerinin Alışılmamış İmalat Yöntemlerinin Seçiminde Kullanılması”, Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi, 29:3, (2014).
  7. [7] Gul M., Ak M. F. and Guneri A. F., “Pythagorean fuzzy VIKOR-based approach for safety risk assessment in mine industry”, Journal of Safety Research, 69, 135-153, (2019).
  8. [8] Rahmani S. and Omidvari M. “Assessing safety risk in electricity distribution processes using ET & BA improved technique and its ranking by VIKOR and TOPSIS models in fuzzy environment”, Health and safety at work, 6:1, 1-12, (2016).

Ayrıntılar

Birincil Dil

İngilizce

Konular

Mühendislik

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

29 Şubat 2024

Gönderilme Tarihi

16 Nisan 2021

Kabul Tarihi

28 Nisan 2022

Yayımlandığı Sayı

Yıl 2024 Cilt: 27 Sayı: 1

Kaynak Göster

APA
Karamollaoğlu, H., Yücedağ, İ., & Dogru, İ. (2024). Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method. Politeknik Dergisi, 27(1), 69-79. https://doi.org/10.2339/politeknik.917535
AMA
1.Karamollaoğlu H, Yücedağ İ, Dogru İ. Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method. Politeknik Dergisi. 2024;27(1):69-79. doi:10.2339/politeknik.917535
Chicago
Karamollaoğlu, Hamdullah, İbrahim Yücedağ, ve İbrahim Dogru. 2024. “Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method”. Politeknik Dergisi 27 (1): 69-79. https://doi.org/10.2339/politeknik.917535.
EndNote
Karamollaoğlu H, Yücedağ İ, Dogru İ (01 Şubat 2024) Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method. Politeknik Dergisi 27 1 69–79.
IEEE
[1]H. Karamollaoğlu, İ. Yücedağ, ve İ. Dogru, “Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method”, Politeknik Dergisi, c. 27, sy 1, ss. 69–79, Şub. 2024, doi: 10.2339/politeknik.917535.
ISNAD
Karamollaoğlu, Hamdullah - Yücedağ, İbrahim - Dogru, İbrahim. “Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method”. Politeknik Dergisi 27/1 (01 Şubat 2024): 69-79. https://doi.org/10.2339/politeknik.917535.
JAMA
1.Karamollaoğlu H, Yücedağ İ, Dogru İ. Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method. Politeknik Dergisi. 2024;27:69–79.
MLA
Karamollaoğlu, Hamdullah, vd. “Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method”. Politeknik Dergisi, c. 27, sy 1, Şubat 2024, ss. 69-79, doi:10.2339/politeknik.917535.
Vancouver
1.Hamdullah Karamollaoğlu, İbrahim Yücedağ, İbrahim Dogru. Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method. Politeknik Dergisi. 01 Şubat 2024;27(1):69-7. doi:10.2339/politeknik.917535

Cited By

 
TARANDIĞIMIZ DİZİNLER (ABSTRACTING / INDEXING)
181341319013191 13189 13187 13188 18016 

download Bu eser Creative Commons Atıf-AynıLisanslaPaylaş 4.0 Uluslararası ile lisanslanmıştır.