İKİ ÖLÇÜTLÜ ZAMANA-BAĞIMLI ÖĞRENME ETKİLİ ÇİZELGELEME PROBLEMİ
Öz
Anahtar Kelimeler
Kaynakça
- 1. AZİZOĞLU M., KONDAKÇI S., KÖKSALAN M., “Single machine scheduling with maximum earliness and number tardy”, Computers & Industrial Engineering, 45, 2003, 257–268.
- 2. BISKUP D. Single-machine scheduling with learning considerations, European Journal of Operational Research, 115, 173-178, 1999.
- 3. BISKUP D., A state-of-the-art review on scheduling with learning effects, European Journal of Operational Research, in print, 2008.
- 4. Cheng T.C.E., Wang G. “Single machine scheduling with learning effect considerations”, Annals of Operation Research, 98, 2000, 273–290.
- 5. DU J., LEUNG J.Y.T., Minimizing total tardiness on one machine is NPhard, Mathematics of Operations Research, 15, 1990, 483–495.
- 6. EREN T., GÜNER E., Minimizing total tardiness in a scheduling problem with a learning effect, Applied Mathematical Modelling, 31, 2007, 1351-1361.
- 7. GÜNER E., EROL S., TANI K., “One Machine Scheduling to Minimize The Maximum Earliness with Minimum Number of Tardy Jobs”, International Journal of Production Economics, 55, 1998, 213-219.
- 8. KUO, W.-H., YANG, D.-L., Minimizing the total completion time in a singlemachine scheduling problem with a time-dependent learning effect, European Journal of Operational Research, 174, 2006a, 1184- 1190.
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
-
Yazarlar
Dr.tamer Eren
Bu kişi benim
Yayımlanma Tarihi
1 Mart 2009
Gönderilme Tarihi
12 Haziran 2015
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2009 Cilt: 14 Sayı: 1