Araştırma Makalesi

INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS

Cilt: 7 Sayı: 2 1 Haziran 2019
  • İsmail Durgut
  • John Steinar Gudmundsson
  • Alberto Di Lullo
PDF İndir
EN TR

INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS

Öz

Pressure surge in a pipe due to sudden flow rate change or full-stop of fluid flow is a pressure wave propagating in fluid along the pipe. This phenomenon has been used to determine the flow rate and to detect and monitor changes in effective flow diameter. It turns out that the pressure surge, also known as pressure pulse, can be used to estimate the formation transmissivity and storativity in the near wellbore region. In this study, propagation of pressure pulse generated by sudden valve closure is simulated with a transient pipe flow model, and it is coupled with a transient analytical reservoir model. The coupled model is used to estimate the reservoir parameters by history matching approach, which is to iterate the transmissivity and the storativity values until an acceptable match is obtained between the measured and simulated pressure history at the upstream of valve. The developed modeling and estimation scheme is applied with two data sets from a field well test to estimate reservoir parameters. The reservoir parameters transmissivity and storativity in the near wellbore region were obtained from the history matching analysis. Matching analysis with the coupled model on the recorded wellhead pressure during two tests showing obvious different flowing conditions points out very similar reservoir parameter values.

Anahtar Kelimeler

Kaynakça

  1. Carey, M. A., Mondal, S., and Sharma, M. M., 2015. Analysis of Water Hammer Signatures for Fracture Diagnostics, SPE Paper 174866 presented the SPE Annual Technical Conference and Exhibition held in Houston, Texas, USA, 28–30 September 2015.
  2. Chevray, R. and Mathieu, J., 1993. Topics in Fluid Mechanics, Cambridge University Press.
  3. Chierici, G. L., 1994. Principles of Petroleum Reservoir Engineering Volume 1, Springer-Verlag Berlin.
  4. Falk, K. 1999. Pressure pulse propagation in gas-liquid pipe flow: modeling, experiments, and field testing, Ph.D. dissertation, NTNU, Trondheim.
  5. Horne, R.N., 1995. Modern Well Test Analysis, A Computer Aided Approach, 2nd edition, Petroway Inc., USA.
  6. Howe, M. S., 2006. Hydrodynamics and Sound, Cambridge University Press.
  7. Ghidaoui, M. S., Zhao, M., McInnis D. A., and Axworthy, D. H., 2005. A Review of Water Hammer Theory and Practice. Applied Mechanics Reviews 58(1), 49-76.
  8. Gudmundsson, J. S. and Celius, H. K., 1999. Gas-Liquid Metering Using Pressure-Pulse Technology. SPE Paper 56584, Annual Technical Conference and Exhibiton, Houston, 3-6 October 1999.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Mühendislik

Bölüm

Araştırma Makalesi

Yazarlar

İsmail Durgut Bu kişi benim
Türkiye

John Steinar Gudmundsson Bu kişi benim
Norway

Alberto Di Lullo Bu kişi benim
Italy

Yayımlanma Tarihi

1 Haziran 2019

Gönderilme Tarihi

16 Ekim 2018

Kabul Tarihi

26 Şubat 2019

Yayımlandığı Sayı

Yıl 2019 Cilt: 7 Sayı: 2

Kaynak Göster

APA
Durgut, İ., Gudmundsson, J. S., & Di Lullo, A. (2019). INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS. Selçuk Üniversitesi Mühendislik, Bilim Ve Teknoloji Dergisi, 7(2), 331-345. https://doi.org/10.15317/Scitech.2019.203
AMA
1.Durgut İ, Gudmundsson JS, Di Lullo A. INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS. sujest. 2019;7(2):331-345. doi:10.15317/Scitech.2019.203
Chicago
Durgut, İsmail, John Steinar Gudmundsson, ve Alberto Di Lullo. 2019. “INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS”. Selçuk Üniversitesi Mühendislik, Bilim Ve Teknoloji Dergisi 7 (2): 331-45. https://doi.org/10.15317/Scitech.2019.203.
EndNote
Durgut İ, Gudmundsson JS, Di Lullo A (01 Haziran 2019) INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS. Selçuk Üniversitesi Mühendislik, Bilim Ve Teknoloji Dergisi 7 2 331–345.
IEEE
[1]İ. Durgut, J. S. Gudmundsson, ve A. Di Lullo, “INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS”, sujest, c. 7, sy 2, ss. 331–345, Haz. 2019, doi: 10.15317/Scitech.2019.203.
ISNAD
Durgut, İsmail - Gudmundsson, John Steinar - Di Lullo, Alberto. “INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS”. Selçuk Üniversitesi Mühendislik, Bilim Ve Teknoloji Dergisi 7/2 (01 Haziran 2019): 331-345. https://doi.org/10.15317/Scitech.2019.203.
JAMA
1.Durgut İ, Gudmundsson JS, Di Lullo A. INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS. sujest. 2019;7:331–345.
MLA
Durgut, İsmail, vd. “INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS”. Selçuk Üniversitesi Mühendislik, Bilim Ve Teknoloji Dergisi, c. 7, sy 2, Haziran 2019, ss. 331-45, doi:10.15317/Scitech.2019.203.
Vancouver
1.İsmail Durgut, John Steinar Gudmundsson, Alberto Di Lullo. INVESTIGATING USE OF PRESSURE PULSES TO ASSESS NEAR WELLBORE RESERVOIR PARAMETERS. sujest. 01 Haziran 2019;7(2):331-45. doi:10.15317/Scitech.2019.203

MAKALELERINIZI 

http://sujest.selcuk.edu.tr

uzerinden gonderiniz