Araştırma Makalesi

Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3)

Cilt: 33 Sayı: 4 1 Temmuz 2022
PDF İndir
TR EN

Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3)

Öz

The performance of the Public Private Partnership (PPP) projects depends on the efficiency of the risk allocation strategies between the public and private parties. Therefore, a multi agent system-based Risk Allocation Model for PPP projects (RAMP3) was developed to determine the proper risk allocation decisions between the public and private parties within the study. The methodology of RAMP3 involves i) identification of risks by agents, ii) assessment of each risk’s importance and impact, iii) communication of agents to negotiate on risk allocation decision and iv) determination of strategies and utility functions to be used in negotiation process. Focus of the study is presenting the steps of negotiation process of agents using economic theory and Zeuthen bargaining strategy. RAMP3 was validated on two real PPP projects and results show that the higher risk value of an agent gets, agent’s utility due to counter agent in that concession round lowers. Preliminary findings also show that risk is allocated to the party that has a higher risk acceptability in negotiation process. The RAMP3 will enable project parties to determine the appropriate risk allocation strategies by considering the effects of emerging risks in terms of time delay, cost overrun and conflict and provide contract success. The model can also be used as a decision support system by public partner for performing an efficient and accurate risk allocation.

Anahtar Kelimeler

Destekleyen Kurum

Coordinatorship of Scientific Research Projects of Yildiz Technical University

Proje Numarası

2014-05-01-DOP03

Kaynakça

  1. Ke, Y., Wang, S., Chan, A. P., Lam, P. T. I., Preferred Risk Allocation in China’s Public–Private Partnership (PPP) Projects, International Journal of Project Management, 28(5), 482–492, 2010.
  2. Hwang, B. G., Zhao, X., Gay, M. J.S., Public Private Partnership Projects in Singapore: Factors, Critical Risks and Preferred Risk Allocation from the Perspective of Contractor, International Journal of Project Management, 31(3), 424-433, 2013.
  3. Gross, M. E., Aligning Public-Private Partnership Contracts with Public Objectives for Transportation Infrastructure, Doctoral Thesis, Virginia Polytechnic Institute and State University, 2010.
  4. Yun-na, W. U., Xin-liang, H. U., Ling-shuang, X. U., Ze-zhong, L., Research on Risk Allocation of Public-Private Partnership Projects Based on Rough Set Theory, Communications in Information Science and Management Engineering, 2(7), 15-20, 2012.
  5. Marques, R. C., Berg, S., Risks, Contracts, and Private-Sector Participation in Infrastructure, Journal of Construction Engineering and Management, 137(11), 925-932, 2011.
  6. Thomas, A. V., Kalidindi, S. N., Ananthanarayanan, K., Risk Perception Analysis of BOT Road Project Participants in India, Construction Management and Economics, 21(4), 393–407, 2003.
  7. Lam, K. C., Wang, D., Lee, T. K. P., Tsang, Y. T., Modelling Risk Allocation Decision in Construction Contracts, International Journal of Project Management, 25(5), 485–493, 2000.
  8. Ren, Z., Anumba, C. J., Multi-Agent Systems in Construction–State of The Art and Prospects, Automation in Construction, 13(3), 421-434, 2004.

Ayrıntılar

Birincil Dil

İngilizce

Konular

İnşaat Mühendisliği

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

1 Temmuz 2022

Gönderilme Tarihi

30 Mayıs 2020

Kabul Tarihi

1 Mart 2021

Yayımlandığı Sayı

Yıl 2022 Cilt: 33 Sayı: 4

Kaynak Göster

APA
Aladağ, H., & Işık, Z. (2022). Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3). Teknik Dergi, 33(4), 12119-12142. https://doi.org/10.18400/tekderg.745510
AMA
1.Aladağ H, Işık Z. Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3). Teknik Dergi. 2022;33(4):12119-12142. doi:10.18400/tekderg.745510
Chicago
Aladağ, Hande, ve Zeynep Işık. 2022. “Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3)”. Teknik Dergi 33 (4): 12119-42. https://doi.org/10.18400/tekderg.745510.
EndNote
Aladağ H, Işık Z (01 Temmuz 2022) Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3). Teknik Dergi 33 4 12119–12142.
IEEE
[1]H. Aladağ ve Z. Işık, “Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3)”, Teknik Dergi, c. 33, sy 4, ss. 12119–12142, Tem. 2022, doi: 10.18400/tekderg.745510.
ISNAD
Aladağ, Hande - Işık, Zeynep. “Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3)”. Teknik Dergi 33/4 (01 Temmuz 2022): 12119-12142. https://doi.org/10.18400/tekderg.745510.
JAMA
1.Aladağ H, Işık Z. Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3). Teknik Dergi. 2022;33:12119–12142.
MLA
Aladağ, Hande, ve Zeynep Işık. “Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3)”. Teknik Dergi, c. 33, sy 4, Temmuz 2022, ss. 12119-42, doi:10.18400/tekderg.745510.
Vancouver
1.Hande Aladağ, Zeynep Işık. Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3). Teknik Dergi. 01 Temmuz 2022;33(4):12119-42. doi:10.18400/tekderg.745510

Cited By