EN
TR
A BRANCH AND BOUND APPROACH FOR SINGLE MACHINE SCHEDULING PROBLEM
Öz
Last decades, scheduling problems have attracted researchers because of the fact that they play a critical role in production planning. This paper studies to minimize the sum weight of lateness on a single machine scheduling problem. There are given n jobs and for each job we have a release date, a processing time, a due date and weight in a constraint working environment. Single machine models are important for various reasons because of the fact that it not only provides insights into the single machine environment but also bottleneck problem. There are various exact methods in order to solve single machine scheduling problem with make span objective function. However, if the objective functions is tardiness, lateness, weighted tardiness, weighted lateness etc. to find exact solution is very difficult. In this paper, branch and bound method is proposed to solve single machine scheduling problem with the total weighed lateness objective for small number of job. The proposed method has applied on a job size of 4, 5 and 8 and provides optimal result.
Anahtar Kelimeler
Kaynakça
- Atan M. O., Akturk M. S., (2008), Single CNC machine scheduling with controllable processing times and multiple due dates, International Journal of Production Research 46, 6087-6111.
- Baker K. R. and Trietsch D., (2009), Principles of sequencing and scheduling, A John Wiley& Sons Inc, Hoboken, New Jersey, 2009. Batsyn M., Goldengorin B., Pardalos M. Sukhov P., (2014), Online heuristic for the preemptive single machine scheduling problem of minimizing the total weighted completion time, Journal of Optimization Methods and Software, 23(5), 13-17.
- Batun S. and Azizoğlu M., (2009), Single machine scheduling with preventive maintenance, International Journal of Production Research, Vol. 47, No. 7, 1753–1771.
- Benmansour R., Hamid A.& Artiba A., (2012), Stochastic single machine scheduling with random common due date, Journal International Journal of Production Research, Volume 50, 2012 -Issue 13.
- Bülbül K., Kaminsky P., and Yano C., (2007), Preemption in single machine earliness/tardiness scheduling, Springer Science and Business Media, LLC 2007.
- Chang P.C, Chung Y.K., Hsieh, J.C., (2004), On single-machine scheduling with release times to minimize total weighted completion time, Journal of the Chinese Institute of Industrial Engineers, Vol. 21, 567-575.
- Du J., Leung J.Y.T., (1990), Minimizing total tardiness on one machine is NP-hard; Mathematics of Operations Research Vol. 15, No. 3 (Aug., 1990), 483-495.
- Gordon, V., Potapneva E. and Werner F., (1997), Single machine scheduling with deadlines, release and due dates, Optimization, 42, 219-244.
Ayrıntılar
Birincil Dil
İngilizce
Konular
-
Bölüm
Araştırma Makalesi
Yayımlanma Tarihi
30 Haziran 2017
Gönderilme Tarihi
22 Haziran 2017
Kabul Tarihi
30 Haziran 2017
Yayımlandığı Sayı
Yıl 2017 Cilt: 16 Sayı: 31
APA
Dawd, S. T., & Ayvaz, B. (2017). A BRANCH AND BOUND APPROACH FOR SINGLE MACHINE SCHEDULING PROBLEM. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, 16(31), 43-55. https://izlik.org/JA23DT99PD
AMA
1.Dawd ST, Ayvaz B. A BRANCH AND BOUND APPROACH FOR SINGLE MACHINE SCHEDULING PROBLEM. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi. 2017;16(31):43-55. https://izlik.org/JA23DT99PD
Chicago
Dawd, Sebrina Tadesse, ve Berk Ayvaz. 2017. “A BRANCH AND BOUND APPROACH FOR SINGLE MACHINE SCHEDULING PROBLEM”. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi 16 (31): 43-55. https://izlik.org/JA23DT99PD.
EndNote
Dawd ST, Ayvaz B (01 Haziran 2017) A BRANCH AND BOUND APPROACH FOR SINGLE MACHINE SCHEDULING PROBLEM. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi 16 31 43–55.
IEEE
[1]S. T. Dawd ve B. Ayvaz, “A BRANCH AND BOUND APPROACH FOR SINGLE MACHINE SCHEDULING PROBLEM”, İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, c. 16, sy 31, ss. 43–55, Haz. 2017, [çevrimiçi]. Erişim adresi: https://izlik.org/JA23DT99PD
ISNAD
Dawd, Sebrina Tadesse - Ayvaz, Berk. “A BRANCH AND BOUND APPROACH FOR SINGLE MACHINE SCHEDULING PROBLEM”. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi 16/31 (01 Haziran 2017): 43-55. https://izlik.org/JA23DT99PD.
JAMA
1.Dawd ST, Ayvaz B. A BRANCH AND BOUND APPROACH FOR SINGLE MACHINE SCHEDULING PROBLEM. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi. 2017;16:43–55.
MLA
Dawd, Sebrina Tadesse, ve Berk Ayvaz. “A BRANCH AND BOUND APPROACH FOR SINGLE MACHINE SCHEDULING PROBLEM”. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, c. 16, sy 31, Haziran 2017, ss. 43-55, https://izlik.org/JA23DT99PD.
Vancouver
1.Sebrina Tadesse Dawd, Berk Ayvaz. A BRANCH AND BOUND APPROACH FOR SINGLE MACHINE SCHEDULING PROBLEM. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi [Internet]. 01 Haziran 2017;16(31):43-55. Erişim adresi: https://izlik.org/JA23DT99PD
