BibTex RIS Kaynak Göster

A Review On Lot Streaming Problems With Transportation Activities

Yıl 2007, Cilt: 6 Sayı: 11, 129 - 142, 01.06.2007

Öz

Kaynakça

  • Bogaschewsky, R. W., Buscher, U. D., and Lindner, G., (2001), “Optimizing Multi- Stage Production with Constant Lot Size and Varying Number of Unequal Sized Batches”, Omega, 29, 183-191.
  • Chang, J. H., and Chiu, H. N., (2005), “Comprehensive Review of Lot Streaming”, International Journal of Production Research, 43, 8, 1515-1536.
  • Chiu, H. N., and Chang, J. H., (2005), “Cost Models for Lot Streaming in a Multistage Flow Shop”, Omega, 33, 435-450.
  • Chiu, H. N., Chang, J. H., and Lee, C. H., (2004), “Lot Streaming Models with a Limited Number of Capacitated Transporters in Multistage Batch Production Systems”, Computers & Operations Research, 31, 2003-2020.
  • Feldman, M., and Biskup, D., (2005), “On Lot Streaming with Multiple Products”, Discussion Paper, No. 542, Bielefeld University, Germany.
  • Goyal, S. K., (1976), “Notes on Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”, Management Science, 23, 332- 333.
  • Hall, N. G., Laporte, G., Selvarajah, E., and Sriskandarajah, C., (2003), “Scheduling and Lot Streaming in Flow Shops with No-Wait in Process”, Journal of Scheduling, 6, 339-354.
  • Kalir, A. A., and Sarin, S. C., (2001), “Optimal Solutions for The Single Batch, Flow Shop, Lot-Streaming Problem with Equal Sublots”, Decision Science, 32, 387- 397.
  • Kim, S. L., and Ha, D., (2003), “A JIT Lot-Splitting Model for Supply Chain Management: Enhancing Buyer-Supplier Linkage”, International Journal of Production Economics, 86, 1, 1-10.
  • Kropp, D. H., and Smunt, T. L., (1990), “Optimal and Heuristic Models for Lot Splitting in a Flow Shop”, Decision Sciences, 21, 691-709.
  • Li, C. L., and Xiao, W. Q., (2004), “Lot Streaming with Supplier-Manufacturer Coordination”, Naval Research Logistics, 51, 4, 522-542.
  • Ramasesh, V. R., Haizhen, F., Duncan, K. H. F., and Jack, C. H., (2000), “Lot Streaming in Multistage Production Systems”, International Journal on Production Economics, 66, 199-211.
  • Riezebos, J., (2004), “Time Bucket Length and Lot Splitting Approach”, International Journal of Production Research, 42, 2325-2338.
  • Sen, A., and Benli, O. S., (1999), “Lot Streaming in Open Shops”, Operations Research Letters, 23, 135-142.
  • Steiner, G., and Truscott, W. G., (1993), “Batch Scheduling to Minimize Cycle Time, Flow Time, and Processing Cost”, IIE Transactions, 25, 90-97.
  • Szendrovits, A. Z., (1975), “Manufacturing Cycle Time Determination for a Multi- Stage Economic Production Quantity Model”, Management Science, 22, 298-308.
  • Szendrovits, A. Z., (1976), “On The Optimality of Sub-Batch for a Multi-Stage EPQ Model - A Rejoinder”, Management Science, 23, 334-338.
  • Trietsch, D., and Baker, K. R., (1993), “Basic Techniques for Lot Streaming”, Operations Research, 41, 1065-1076.
  • Truscott, W. G., (1986), “Production Scheduling with Capacity-Constrained Transportation Activities”, Journal of Operations Management, 6, 333-348.
  • Van Nieuwenhuyse, I., and Vandaele, N., (2003), “Minimizing Total Costs in Flow Shops with Overlapping Operations: The Importance of Gap Costs”, Proceedings of the POMS 2003 Annual Meeting, Savannah.
  • Van Nieuwenhuyse, I., and Vandaele, N., (2006), “The Impact of Delivery Lot Splitting on Delivery Reliability in a Two-Stage Supply Chain”, International Journal of Production Economics, 104, 2, 694-708.

A Review On Lot Streaming Problems With Transportation Activities

Yıl 2007, Cilt: 6 Sayı: 11, 129 - 142, 01.06.2007

Öz

Parti bölme işlemi, üretim partisini daha küçük alt partilere bölmek ve bu alt partileri performans ölçütlerine göre makinelerde sıralamak şeklinde tanımlanabilir. Performans ölçütü zaman tabanlı (tamamlanma süresi) ya da maliyet tabanlı (toplam maliyet) olabilir. Ama bazı çalışmalarda ikisinin entegre edildiği de görülmektedir. Parti bölme problemlerinde, üretim sisteminin karakteristikleri önemlidir. Üretim sisteminin tek/çok aşamalı, ya da tek/çok ürünlü olması, parti bölme probleminin çözüm karmaşıklığını belirler. Bu sistemler aynı zamanda problemin çözümünü zorlaştıran bazı aktiviteleri de (üretim, hazırlık, taşıma gibi) içerebilir. Bu makale literatürdeki taşıma aktivitelerini içeren parti bölme problemlerini incelemektedir. Taşıyıcıların sayısı, kapasiteleri ve taşıyıcıların çizelgelenmesi bu tip parti bölme problemlerinin bileşenleridir. Parti bölme problemlerinde taşıma aktivitelerini dikkate almak, problemi gerçek hayat problemlerine yaklaştırmaktadır. Bu literatür taraması, tek/çok aşamalı ve tek/çok ürünlü kategorilerinde yapılmıştır. Ayrıca bu makale, taşıma aktivitelerini içeren parti bölme problemlerine farklı perspektifler geliştirme ve geleceğe yönelik araştırma çalışmalarına ışık tutma amacındadır

Kaynakça

  • Bogaschewsky, R. W., Buscher, U. D., and Lindner, G., (2001), “Optimizing Multi- Stage Production with Constant Lot Size and Varying Number of Unequal Sized Batches”, Omega, 29, 183-191.
  • Chang, J. H., and Chiu, H. N., (2005), “Comprehensive Review of Lot Streaming”, International Journal of Production Research, 43, 8, 1515-1536.
  • Chiu, H. N., and Chang, J. H., (2005), “Cost Models for Lot Streaming in a Multistage Flow Shop”, Omega, 33, 435-450.
  • Chiu, H. N., Chang, J. H., and Lee, C. H., (2004), “Lot Streaming Models with a Limited Number of Capacitated Transporters in Multistage Batch Production Systems”, Computers & Operations Research, 31, 2003-2020.
  • Feldman, M., and Biskup, D., (2005), “On Lot Streaming with Multiple Products”, Discussion Paper, No. 542, Bielefeld University, Germany.
  • Goyal, S. K., (1976), “Notes on Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”, Management Science, 23, 332- 333.
  • Hall, N. G., Laporte, G., Selvarajah, E., and Sriskandarajah, C., (2003), “Scheduling and Lot Streaming in Flow Shops with No-Wait in Process”, Journal of Scheduling, 6, 339-354.
  • Kalir, A. A., and Sarin, S. C., (2001), “Optimal Solutions for The Single Batch, Flow Shop, Lot-Streaming Problem with Equal Sublots”, Decision Science, 32, 387- 397.
  • Kim, S. L., and Ha, D., (2003), “A JIT Lot-Splitting Model for Supply Chain Management: Enhancing Buyer-Supplier Linkage”, International Journal of Production Economics, 86, 1, 1-10.
  • Kropp, D. H., and Smunt, T. L., (1990), “Optimal and Heuristic Models for Lot Splitting in a Flow Shop”, Decision Sciences, 21, 691-709.
  • Li, C. L., and Xiao, W. Q., (2004), “Lot Streaming with Supplier-Manufacturer Coordination”, Naval Research Logistics, 51, 4, 522-542.
  • Ramasesh, V. R., Haizhen, F., Duncan, K. H. F., and Jack, C. H., (2000), “Lot Streaming in Multistage Production Systems”, International Journal on Production Economics, 66, 199-211.
  • Riezebos, J., (2004), “Time Bucket Length and Lot Splitting Approach”, International Journal of Production Research, 42, 2325-2338.
  • Sen, A., and Benli, O. S., (1999), “Lot Streaming in Open Shops”, Operations Research Letters, 23, 135-142.
  • Steiner, G., and Truscott, W. G., (1993), “Batch Scheduling to Minimize Cycle Time, Flow Time, and Processing Cost”, IIE Transactions, 25, 90-97.
  • Szendrovits, A. Z., (1975), “Manufacturing Cycle Time Determination for a Multi- Stage Economic Production Quantity Model”, Management Science, 22, 298-308.
  • Szendrovits, A. Z., (1976), “On The Optimality of Sub-Batch for a Multi-Stage EPQ Model - A Rejoinder”, Management Science, 23, 334-338.
  • Trietsch, D., and Baker, K. R., (1993), “Basic Techniques for Lot Streaming”, Operations Research, 41, 1065-1076.
  • Truscott, W. G., (1986), “Production Scheduling with Capacity-Constrained Transportation Activities”, Journal of Operations Management, 6, 333-348.
  • Van Nieuwenhuyse, I., and Vandaele, N., (2003), “Minimizing Total Costs in Flow Shops with Overlapping Operations: The Importance of Gap Costs”, Proceedings of the POMS 2003 Annual Meeting, Savannah.
  • Van Nieuwenhuyse, I., and Vandaele, N., (2006), “The Impact of Delivery Lot Splitting on Delivery Reliability in a Two-Stage Supply Chain”, International Journal of Production Economics, 104, 2, 694-708.
Toplam 21 adet kaynakça vardır.

Ayrıntılar

Birincil Dil Türkçe
Bölüm Araştırma Makaleleri
Yazarlar

Rahime Sancar Edis Bu kişi benim

Arslan M. Örnek Bu kişi benim

Deniz Türsel Eliiyi Bu kişi benim

Yayımlanma Tarihi 1 Haziran 2007
Gönderilme Tarihi 10 Ağustos 2015
Yayımlandığı Sayı Yıl 2007 Cilt: 6 Sayı: 11

Kaynak Göster

APA Edis, R. S., Örnek, A. M., & Eliiyi, D. T. (2007). A Review On Lot Streaming Problems With Transportation Activities. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, 6(11), 129-142.
AMA Edis RS, Örnek AM, Eliiyi DT. A Review On Lot Streaming Problems With Transportation Activities. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi. Haziran 2007;6(11):129-142.
Chicago Edis, Rahime Sancar, Arslan M. Örnek, ve Deniz Türsel Eliiyi. “A Review On Lot Streaming Problems With Transportation Activities”. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi 6, sy. 11 (Haziran 2007): 129-42.
EndNote Edis RS, Örnek AM, Eliiyi DT (01 Haziran 2007) A Review On Lot Streaming Problems With Transportation Activities. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi 6 11 129–142.
IEEE R. S. Edis, A. M. Örnek, ve D. T. Eliiyi, “A Review On Lot Streaming Problems With Transportation Activities”, İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, c. 6, sy. 11, ss. 129–142, 2007.
ISNAD Edis, Rahime Sancar vd. “A Review On Lot Streaming Problems With Transportation Activities”. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi 6/11 (Haziran 2007), 129-142.
JAMA Edis RS, Örnek AM, Eliiyi DT. A Review On Lot Streaming Problems With Transportation Activities. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi. 2007;6:129–142.
MLA Edis, Rahime Sancar vd. “A Review On Lot Streaming Problems With Transportation Activities”. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, c. 6, sy. 11, 2007, ss. 129-42.
Vancouver Edis RS, Örnek AM, Eliiyi DT. A Review On Lot Streaming Problems With Transportation Activities. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi. 2007;6(11):129-42.