The investigation of approximate cost and progress payment for forest road building in Lakes Region of Turkey
Öz
Forest roads are high-cost basic facilities allowing economic, ecological and social functions of forests to be fulfilled. Because the most essential work item affecting road construction cost is excavation works, amount of excavation and land classifications have to be most appropriately determined within bidding process. In regard to application, the amount of work given in approximate cost sheet required for bidding for forest road construction is determined by means of observational methods and the bidding is conducted within the scope of Public Procurement Law No:4734 before the project is made. After the documents including approximate cost, bidding and payment for 43 forest roads built in The Lakes Region of Turkey (Isparta Regional Directorate of Forestry) during the period (2003-2008) were obtained, the project started. The amount and cost of work determined in the bidding process for the roads involved in the research have been compared with those determined in the progress payment process. Within these comparisons, a consideration has been carried out by using tables, graphics and statistical methods. After the bidding files in the scope of Public Procurement Law in force were inspected, faulting components of the current application have been determined and solutions are suggested. It has been detected that the cost and amount of excavation determined in the bidding process differ from those determined in the payment process. It has been found out that it is not sufficient to determine amount of work given in bidding sheets related to road construction only by means of observation-based field reconnaissance. Projects providing better results as a result of using modern methods which can specify structure of land depth while conducting a road construction shall be designed. For this reason, geophysical methods can be benefited from. In order to conduct effectively biddings for forest road construction, amount of excavation and its distribution to land classifications shall be most appropriately determined.
Anahtar Kelimeler
Kaynakça
- Acar, H.H., Eker, M., 2001. Excavator using for the forest road construction at steep terrain and its case in Turkey. Third Balkan Scientific Conference, Study Conservation and Utilization of Forest Resources, Proceedings Volume IV, pp.2- 6, Sofia.
- Acar, H.H., Eker M., Coşkun, N., 2003. A research on the determination of the forest roads ground base type by terrestrial methods. Proceeding, High Tech. Forest Operations for Mountainous Terrain, 5-9, October 2003, Schlaegl-Austria.
- Destanlıoğlu, C., Önder S., 2009. Isparta Eğirdir Karayolunun Peyzaj Planlama İlkeleri açısından İrdelenmesi, SDÜ Orman Fakültesi Dergisi, Seri A/1, 154-166, Isparta.
- Eker, M., Acar, H.H., Çoban, H.O., 2010. Orman Yollarının Potansiyel Ekolojik Etkileri, SDÜ Orman Fakültesi Dergisi, Seri A/1, 109-125, Isparta.
- Erdaş, O., Acar, H.H., Tunay, M., Karaman, A., 1995. Türkiye’de Orman İşçiliği ve Üretim, Orman Yolları, Orman Ürünleri Transportu, Ormancılıkta Mekanizasyon ve Mülkiyet-Kadastro ile İlgili Sorunlar ve Çözüm Önerileri, Türkiye Ormancılık Raporu, KTÜ Orman Fakültesi Yayın No. 48, Trabzon.
- Karabacak, M., 2010. Göller Bölgesinde İnşa Edilen Orman Yollarında Yaklaşık Maliyet ve Hakediş değerlerinin İrdelenmesi, Yüksek Lisans Tezi, Karadeniz Teknik Üniversitesi Fen Bilimleri Enstitüsü, 98 s., Trabzon.
- OGM, 2011. Ülkemizdeki orman alanlarının durumu. Orman Genel Müdürlüğü internet sitesi, http://www.ogm.gov.tr, [Erişim zamanı: 12 Mart 2011].
Ayrıntılar
Birincil Dil
İngilizce
Konular
-
Bölüm
-
Yayımlanma Tarihi
6 Nisan 2012
Gönderilme Tarihi
29 Nisan 2011
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2012 Cilt: 13 Sayı: 1
APA
Acar, H. H., & Karabacak, M. (2012). The investigation of approximate cost and progress payment for forest road building in Lakes Region of Turkey. Turkish Journal of Forestry, 13(1), 21-27. https://doi.org/10.18182/tjf.21878
AMA
1.Acar HH, Karabacak M. The investigation of approximate cost and progress payment for forest road building in Lakes Region of Turkey. Turkish Journal of Forestry. 2012;13(1):21-27. doi:10.18182/tjf.21878
Chicago
Acar, H. Hulusi, ve Mehmet Karabacak. 2012. “The investigation of approximate cost and progress payment for forest road building in Lakes Region of Turkey”. Turkish Journal of Forestry 13 (1): 21-27. https://doi.org/10.18182/tjf.21878.
EndNote
Acar HH, Karabacak M (01 Nisan 2012) The investigation of approximate cost and progress payment for forest road building in Lakes Region of Turkey. Turkish Journal of Forestry 13 1 21–27.
IEEE
[1]H. H. Acar ve M. Karabacak, “The investigation of approximate cost and progress payment for forest road building in Lakes Region of Turkey”, Turkish Journal of Forestry, c. 13, sy 1, ss. 21–27, Nis. 2012, doi: 10.18182/tjf.21878.
ISNAD
Acar, H. Hulusi - Karabacak, Mehmet. “The investigation of approximate cost and progress payment for forest road building in Lakes Region of Turkey”. Turkish Journal of Forestry 13/1 (01 Nisan 2012): 21-27. https://doi.org/10.18182/tjf.21878.
JAMA
1.Acar HH, Karabacak M. The investigation of approximate cost and progress payment for forest road building in Lakes Region of Turkey. Turkish Journal of Forestry. 2012;13:21–27.
MLA
Acar, H. Hulusi, ve Mehmet Karabacak. “The investigation of approximate cost and progress payment for forest road building in Lakes Region of Turkey”. Turkish Journal of Forestry, c. 13, sy 1, Nisan 2012, ss. 21-27, doi:10.18182/tjf.21878.
Vancouver
1.H. Hulusi Acar, Mehmet Karabacak. The investigation of approximate cost and progress payment for forest road building in Lakes Region of Turkey. Turkish Journal of Forestry. 01 Nisan 2012;13(1):21-7. doi:10.18182/tjf.21878