Uzundere 1 Regülatörü ve HES Pelton Çark Erozyon ve Kavitasyon Takibi
Öz
Anahtar Kelimeler
Kaynakça
- Are horizontal axis Pelton units more challenging concerning vibration? Some special cases analysed – P. Caretti, Voith Hydro, Italy; T. Lora-Ronco, EDF, France (Hydro2016 Montreux, Switzerland 10 to 12 October 2016, Hydraulic machinery: Research and modelling)
- Maintenance works and decision-making for hydro facilities – Y. Mizuhashi, Electric Power Development Co Ltd, Japan, (Hydro2016 Montreux, Switzerland 10 to 12 October 2016, Hydraulic machineryDecision making for hydro plant renewals ,IEA session)
- Risk-based decision making approaches for hydropower asset refurbishment – T. Ang, Hydro Tasmania, Australia; N. Nielsen, IEA, Australia (Hydro2016 Montreux, Switzerland 10 to 12 October 2016, Hydraulic machineryDecision making for hydro plant renewals ,IEA session)
- Upgrading work on the horizontal Pelton turbines at the Tussa hydro plant, Norway – J.O. Haugen, Rainpower Norge AS, Norway; T. Myklebust, Tussa Energi AS, Norway; J.B. Moe, Hydrocell Consulting AS, Norway (Hydro2016 Montreux, Switzerland 10 to 12 October 2016, Refurbishment and upgrading)
- Quality Data Book Uzundere Runner Spare , Alstom France, A.Fernandez, J.V.Lopez
- Andritz Hydro Türkiye, Ayşen ÖZBAŞ, Head of Service & Rehabilitation, aysen.ozbas@andritz.com
- Andritz Hydro Türkiye ,Talha Çetinkaya , Mechanical Engineer / Workshop Engineer, Talha.Cetinkaya@andritz.com
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
Araştırma Makalesi
Yazarlar
Osman Köse
*
0000-0002-2496-3392
Türkiye
Yayımlanma Tarihi
28 Haziran 2022
Gönderilme Tarihi
12 Mayıs 2022
Kabul Tarihi
15 Haziran 2022
Yayımlandığı Sayı
Yıl 2022 Cilt: 6 Sayı: 1
