Araştırma Makalesi
BibTex RIS Kaynak Göster
Yıl 2011, Cilt: 32 Sayı: 2, 89 - 103, 01.03.2011

Öz

Kaynakça

  • Bilgin, N., Seyrek, T., and Shahriar, K., 1988. Ro- adheader performance in Istanbul, Gol- den Horn clean-up contributes valuab- le data. Tunnels and Tunnelling (June), 41–44.
  • Bilgin, N., Seyrek, T., Erdinc, E., and Shahriar, K., 1990. Roadheaders glean valuab- le tips for Istanbul Metro. Tunnels and
  • Tunnelling (October), 29–32.
  • Bilgin, N., Yazıcı, S., and Eskikaya, S., 1996. A model to predict the performance of ro- adheaders and impact hammers in tun- nel drivages. Proceedings, Eurock ’96, Balkema, 715–720.
  • Bilgin, N., Kuzu, C., and Eskikaya, S., 1997. Cut- ting performance of rock hammers and roadheaders in Istanbul Metro driva- ges. Proceedings, Word Tunnel Cong- ress’97, Tunnels for People, Balkema, 455–460.
  • Bilgin, N., Dincer, T., Copur, H., and Erdogan, M., 2004. Some geological and geo- technical factors affecting the perfor- mance of a roadheader in an inclined tunnel. Tunnelling and Underground Space Technology. 19, 629-636.
  • Copur, H., Rostami, J., Ozdemir, L., and Bilgin, N., 1997. Studies on performance pre- diction of roadheaders. Proceedings of the 4th International Symposium on Mine Mechanization and Automation, Brisbane, Qld., Australia, A4-1–A4-7.
  • Copur, H., Ozdemir, L., and Rostami, J., 1998. Roadheader applications in mining and tunneling. Mining Engineering. 50, 38– 42.
  • Dosco Overseas Engineering Ltd, 2008. WWW. dosco.co.uk
  • Douglas, W., 1985. Roadheaders open new ho- rizons at San Manuel. Engineering and Mining Journal. 186, 22–25.
  • Ebrahimabadi, A., 2010. A model to predict the performance of roadheaders in tunne- ling. Ph.D. Thesis, Azad University, Sci- ence and Research Branch, Tehran, Iran (Unpublished).
  • Ebrahimabadi, A., Goshtasbi, K., Shahriar, K., and Cherghi Seifabad, M., 2011. A mo- del to predict the performance of ro- adheaders based on rock mass brittle- ness index. Journal of the South African Institute of Mining and Metallurgy (SA- IMM). 111, 1-10.
  • Gehring, K.H., 1989. A cutting comparison. Tun- nels and Tunnelling (November), 27–30.
  • Hartman, H.L., 1992. SME mining engineering hand book. Chapter 22.1: Rapid Exca- vation. 2nd Edition, Littleton. Colorado, 1871–1907.
  • Hekimoglu, O.Z., and Fowell, R.J., 1990. From research into practice In-situ studies for design of boom tunnelling machine cut- ting heads. 31st U.S. Rock Mechanics Symposium, Colorado School of Mines, USA.
  • Hekimoglu, O.Z., 1995. The Radial line con- cept for pick lacing arrangement for ra- dial pick cutting heads. Int. Journal of Rock Mechanics and Mining Sciences and Geomechanical Abstracts. 32(4), 301-311.
  • Hekimoglu, O.Z., Ayhan, M. and Tiryaki, H., 2003. Laboratory and in-Situ investiga- tions of tracking cutters for computer- aided design of shearer drums”, ClM Bulletin. 96 (1073), 72-75.
  • Hekimoglu, O.Z. and Ozdemir, L., 2004. Effects of angle of wrap on the performance of continuous miners and drum shearers. Mining Technology (Trans. Inst. Min. Metall. A). 113(2).
  • McFeat-Smith, I., 1977. Rock property tes- ting for the assessment of tunneling machine performance. Tunnels and Tunneling, 29-33.
  • McFeat-Smith, I., and Fowell, R.J., 1977. Cor- relation of rock properties and the cut- ting performance of tunnelling machi- nes. Conference on Rock Engineering, UK, organized jointly by the British Ge- otechnical Society and Department of Mining Engineering, The University of Newcastle Upon Tyne, 581–602.
  • McFeat-Smith, I., and Fowell, R.J., 1979. The selection and application of roadhea- ders for rock tunneling. In: Proceedings of the Rapid Excavation and Tunnelling Conference, Atlanta. 1, 261– 279.
  • Rostami, J., Ozdemir, L., and Neil, D.M., 1994. Performance prediction: a key issue in mechanical hard rock mining. Mining Engineering, 1263–1267.
  • Sandbak, L.A., 1985, Roadheader drift exca- vation and geomechanical rock clas- sification at San Manuel, Arizona, Pro- ceedings of the Rapid Excavation and
  • Tunnelling Conference. New York, 2,
  • –916 (Chapter 54).
  • Thuro, K., and Plinninger, R.J., 1999. Predicting roadheader advance rates. Tunnels and Tunnelling. 31, 36–39.
  • Yagiz, S., 2008. Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunnelling and Underg- round Space Technology. 23, 326–339.

Predictive Models for Roadheaders’ Cutting Performance in Coal Measure Rocks

Yıl 2011, Cilt: 32 Sayı: 2, 89 - 103, 01.03.2011

Öz

-

Kaynakça

  • Bilgin, N., Seyrek, T., and Shahriar, K., 1988. Ro- adheader performance in Istanbul, Gol- den Horn clean-up contributes valuab- le data. Tunnels and Tunnelling (June), 41–44.
  • Bilgin, N., Seyrek, T., Erdinc, E., and Shahriar, K., 1990. Roadheaders glean valuab- le tips for Istanbul Metro. Tunnels and
  • Tunnelling (October), 29–32.
  • Bilgin, N., Yazıcı, S., and Eskikaya, S., 1996. A model to predict the performance of ro- adheaders and impact hammers in tun- nel drivages. Proceedings, Eurock ’96, Balkema, 715–720.
  • Bilgin, N., Kuzu, C., and Eskikaya, S., 1997. Cut- ting performance of rock hammers and roadheaders in Istanbul Metro driva- ges. Proceedings, Word Tunnel Cong- ress’97, Tunnels for People, Balkema, 455–460.
  • Bilgin, N., Dincer, T., Copur, H., and Erdogan, M., 2004. Some geological and geo- technical factors affecting the perfor- mance of a roadheader in an inclined tunnel. Tunnelling and Underground Space Technology. 19, 629-636.
  • Copur, H., Rostami, J., Ozdemir, L., and Bilgin, N., 1997. Studies on performance pre- diction of roadheaders. Proceedings of the 4th International Symposium on Mine Mechanization and Automation, Brisbane, Qld., Australia, A4-1–A4-7.
  • Copur, H., Ozdemir, L., and Rostami, J., 1998. Roadheader applications in mining and tunneling. Mining Engineering. 50, 38– 42.
  • Dosco Overseas Engineering Ltd, 2008. WWW. dosco.co.uk
  • Douglas, W., 1985. Roadheaders open new ho- rizons at San Manuel. Engineering and Mining Journal. 186, 22–25.
  • Ebrahimabadi, A., 2010. A model to predict the performance of roadheaders in tunne- ling. Ph.D. Thesis, Azad University, Sci- ence and Research Branch, Tehran, Iran (Unpublished).
  • Ebrahimabadi, A., Goshtasbi, K., Shahriar, K., and Cherghi Seifabad, M., 2011. A mo- del to predict the performance of ro- adheaders based on rock mass brittle- ness index. Journal of the South African Institute of Mining and Metallurgy (SA- IMM). 111, 1-10.
  • Gehring, K.H., 1989. A cutting comparison. Tun- nels and Tunnelling (November), 27–30.
  • Hartman, H.L., 1992. SME mining engineering hand book. Chapter 22.1: Rapid Exca- vation. 2nd Edition, Littleton. Colorado, 1871–1907.
  • Hekimoglu, O.Z., and Fowell, R.J., 1990. From research into practice In-situ studies for design of boom tunnelling machine cut- ting heads. 31st U.S. Rock Mechanics Symposium, Colorado School of Mines, USA.
  • Hekimoglu, O.Z., 1995. The Radial line con- cept for pick lacing arrangement for ra- dial pick cutting heads. Int. Journal of Rock Mechanics and Mining Sciences and Geomechanical Abstracts. 32(4), 301-311.
  • Hekimoglu, O.Z., Ayhan, M. and Tiryaki, H., 2003. Laboratory and in-Situ investiga- tions of tracking cutters for computer- aided design of shearer drums”, ClM Bulletin. 96 (1073), 72-75.
  • Hekimoglu, O.Z. and Ozdemir, L., 2004. Effects of angle of wrap on the performance of continuous miners and drum shearers. Mining Technology (Trans. Inst. Min. Metall. A). 113(2).
  • McFeat-Smith, I., 1977. Rock property tes- ting for the assessment of tunneling machine performance. Tunnels and Tunneling, 29-33.
  • McFeat-Smith, I., and Fowell, R.J., 1977. Cor- relation of rock properties and the cut- ting performance of tunnelling machi- nes. Conference on Rock Engineering, UK, organized jointly by the British Ge- otechnical Society and Department of Mining Engineering, The University of Newcastle Upon Tyne, 581–602.
  • McFeat-Smith, I., and Fowell, R.J., 1979. The selection and application of roadhea- ders for rock tunneling. In: Proceedings of the Rapid Excavation and Tunnelling Conference, Atlanta. 1, 261– 279.
  • Rostami, J., Ozdemir, L., and Neil, D.M., 1994. Performance prediction: a key issue in mechanical hard rock mining. Mining Engineering, 1263–1267.
  • Sandbak, L.A., 1985, Roadheader drift exca- vation and geomechanical rock clas- sification at San Manuel, Arizona, Pro- ceedings of the Rapid Excavation and
  • Tunnelling Conference. New York, 2,
  • –916 (Chapter 54).
  • Thuro, K., and Plinninger, R.J., 1999. Predicting roadheader advance rates. Tunnels and Tunnelling. 31, 36–39.
  • Yagiz, S., 2008. Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunnelling and Underg- round Space Technology. 23, 326–339.

Predictive Models for Roadheaders’ Cutting Performance in Coal Measure Rocks

Yıl 2011, Cilt: 32 Sayı: 2, 89 - 103, 01.03.2011

Öz

Roadheaders offer a unique capability and flexibility for the excavation of soft to medium strength rock formations, hence; are extensively used in underground mining and tunneling operations. A critical issue in successful roadheader application is the ability to evaluate and predict the machine performance. The main objective of this research study is to investigate the cutting performance of roadheaders in coal measure rocks by paying special attention to the influence of discontinuity orientation (alpha angle) and the specific energy. With this respect, a database was established from detailed field data including the measured instantaneous cutting rates (ICR) and geomechanical parameters of the coal measure rocks for each cutting condition in the tunnels. The database was then analyzed by utilizing the statistical method in order to yield new predictive models. The influence of alpha angle (the angle between tunnel axis and the planes of weakness) on roadheader performance was investigated and the correlation between them was found to be good (R²=0.96). The analysis of the specific energy also showed that there is a relatively good relation (R²=0.91) between this parameter and ICR. Finally, the new predictive models for ICR (with respect to alpha angle and specific energy) showed to have highly correlated relationships within the limits of measured values and hence may successfully be used to evaluate the performance of medium-duty roadheaders in coal measure rocks.

Kaynakça

  • Bilgin, N., Seyrek, T., and Shahriar, K., 1988. Ro- adheader performance in Istanbul, Gol- den Horn clean-up contributes valuab- le data. Tunnels and Tunnelling (June), 41–44.
  • Bilgin, N., Seyrek, T., Erdinc, E., and Shahriar, K., 1990. Roadheaders glean valuab- le tips for Istanbul Metro. Tunnels and
  • Tunnelling (October), 29–32.
  • Bilgin, N., Yazıcı, S., and Eskikaya, S., 1996. A model to predict the performance of ro- adheaders and impact hammers in tun- nel drivages. Proceedings, Eurock ’96, Balkema, 715–720.
  • Bilgin, N., Kuzu, C., and Eskikaya, S., 1997. Cut- ting performance of rock hammers and roadheaders in Istanbul Metro driva- ges. Proceedings, Word Tunnel Cong- ress’97, Tunnels for People, Balkema, 455–460.
  • Bilgin, N., Dincer, T., Copur, H., and Erdogan, M., 2004. Some geological and geo- technical factors affecting the perfor- mance of a roadheader in an inclined tunnel. Tunnelling and Underground Space Technology. 19, 629-636.
  • Copur, H., Rostami, J., Ozdemir, L., and Bilgin, N., 1997. Studies on performance pre- diction of roadheaders. Proceedings of the 4th International Symposium on Mine Mechanization and Automation, Brisbane, Qld., Australia, A4-1–A4-7.
  • Copur, H., Ozdemir, L., and Rostami, J., 1998. Roadheader applications in mining and tunneling. Mining Engineering. 50, 38– 42.
  • Dosco Overseas Engineering Ltd, 2008. WWW. dosco.co.uk
  • Douglas, W., 1985. Roadheaders open new ho- rizons at San Manuel. Engineering and Mining Journal. 186, 22–25.
  • Ebrahimabadi, A., 2010. A model to predict the performance of roadheaders in tunne- ling. Ph.D. Thesis, Azad University, Sci- ence and Research Branch, Tehran, Iran (Unpublished).
  • Ebrahimabadi, A., Goshtasbi, K., Shahriar, K., and Cherghi Seifabad, M., 2011. A mo- del to predict the performance of ro- adheaders based on rock mass brittle- ness index. Journal of the South African Institute of Mining and Metallurgy (SA- IMM). 111, 1-10.
  • Gehring, K.H., 1989. A cutting comparison. Tun- nels and Tunnelling (November), 27–30.
  • Hartman, H.L., 1992. SME mining engineering hand book. Chapter 22.1: Rapid Exca- vation. 2nd Edition, Littleton. Colorado, 1871–1907.
  • Hekimoglu, O.Z., and Fowell, R.J., 1990. From research into practice In-situ studies for design of boom tunnelling machine cut- ting heads. 31st U.S. Rock Mechanics Symposium, Colorado School of Mines, USA.
  • Hekimoglu, O.Z., 1995. The Radial line con- cept for pick lacing arrangement for ra- dial pick cutting heads. Int. Journal of Rock Mechanics and Mining Sciences and Geomechanical Abstracts. 32(4), 301-311.
  • Hekimoglu, O.Z., Ayhan, M. and Tiryaki, H., 2003. Laboratory and in-Situ investiga- tions of tracking cutters for computer- aided design of shearer drums”, ClM Bulletin. 96 (1073), 72-75.
  • Hekimoglu, O.Z. and Ozdemir, L., 2004. Effects of angle of wrap on the performance of continuous miners and drum shearers. Mining Technology (Trans. Inst. Min. Metall. A). 113(2).
  • McFeat-Smith, I., 1977. Rock property tes- ting for the assessment of tunneling machine performance. Tunnels and Tunneling, 29-33.
  • McFeat-Smith, I., and Fowell, R.J., 1977. Cor- relation of rock properties and the cut- ting performance of tunnelling machi- nes. Conference on Rock Engineering, UK, organized jointly by the British Ge- otechnical Society and Department of Mining Engineering, The University of Newcastle Upon Tyne, 581–602.
  • McFeat-Smith, I., and Fowell, R.J., 1979. The selection and application of roadhea- ders for rock tunneling. In: Proceedings of the Rapid Excavation and Tunnelling Conference, Atlanta. 1, 261– 279.
  • Rostami, J., Ozdemir, L., and Neil, D.M., 1994. Performance prediction: a key issue in mechanical hard rock mining. Mining Engineering, 1263–1267.
  • Sandbak, L.A., 1985, Roadheader drift exca- vation and geomechanical rock clas- sification at San Manuel, Arizona, Pro- ceedings of the Rapid Excavation and
  • Tunnelling Conference. New York, 2,
  • –916 (Chapter 54).
  • Thuro, K., and Plinninger, R.J., 1999. Predicting roadheader advance rates. Tunnels and Tunnelling. 31, 36–39.
  • Yagiz, S., 2008. Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunnelling and Underg- round Space Technology. 23, 326–339.
Toplam 27 adet kaynakça vardır.

Ayrıntılar

Birincil Dil İngilizce
Konular Mühendislik
Bölüm Makaleler
Yazarlar

A. Ebrahımabadı Bu kişi benim

K. Goshtasbı2 Bu kişi benim

K. Shahrıar Bu kişi benim

M. Cheraghi Seıfabad Bu kişi benim

Yayımlanma Tarihi 1 Mart 2011
Gönderilme Tarihi 24 Mart 2015
Yayımlandığı Sayı Yıl 2011 Cilt: 32 Sayı: 2

Kaynak Göster

EndNote Ebrahımabadı A, Goshtasbı2 K, Shahrıar K, Seıfabad MC (01 Mart 2011) Predictive Models for Roadheaders’ Cutting Performance in Coal Measure Rocks. Yerbilimleri 32 2 89–103.