Bulanık Analitik Hiyerarşi Süreci ile Uygun Altı Sigma Metodolojisinin Seçimi
Öz
Anahtar Kelimeler
Kaynakça
- Akman, G. ve Alkan, A., (2006), “Tedarik Zinciri Yönetiminde Bulanık AHP Yöntemi Kullanılarak Tedarikçilerin Performansının Ölçülmesi: Otomotiv Yan Sanayinde Bir Uygulama”, İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, Yıl:5, Sayı:9, Bahar 2006/1, 23-46
- Antony, F., (2007), “Is six sigma a management fad or fact?”, Assembly Automation, 27/1, 17-19
- Banuelas, R. ve Antony, F., (2003), “Going from Six Sigma to Design for Six Sigma: An Exploratory Study Using Analytic Hierarchy Process”, The TQM Magazine, Vol. 15, Num. 5, 334-344.
- Chung, Y. C., vd., (2008), “An empirical study on the correlation between Critical DFSS success factors, DFSS implementation activity levels and business competitive advantages in Taiwan’s high-tech manufacturers“, Total Quality Management, Vol. 19, No.6, 595-697
- De Feo, J. A. Ve Bar-El, Z., (2002), “Creating strategic change more efficiently with a new Design for Six Sigma process”, Journal of Change Management, Vol.3, 60-80
- Drake, D., Sutterfield, J. S., Ngassam, C., (2008), “The Revolutıon Of Sıx-Sigma:An Analysıs of its Theory And Applıcatıon“,Academy of Information and Management Sciences Journal, Volume 11, Number 1,29-45
- Durakbaşa, M. N., vd., (2007), “Altı Sigma: Üretim Proseslerinde Neredeyse Hatasız Üretimin Gerçekleştirildiği Kalite Girişimleri”, www.qfdturkiye.org, Erişim tarihi: 13.07.2009)
- Eckes, G. (2001), “The Six Sigma Revolution”, John Wiley&Sons, NY
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
-
Yazarlar
Çigdem Sofyalıoglu
Bu kişi benim
Yayımlanma Tarihi
1 Haziran 2009
Gönderilme Tarihi
13 Eylül 2014
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2009 Cilt: 16 Sayı: 2