Süreç Yeniliği Yapan Takımların Öğrenmesine Etki Eden Faktörler ve Yenilik Çalışmasının Başarısına Etkileri
Abstract
Keywords
References
- Alter, S. and Ginzberg, M. (1978). Managing uncertainty in MIS implementation. Sloan Management Review, Fall:87-95.
- Bacon, D.R., Stewart, K.A. and Stewart-Belle, S. (1998). Exploring predictors of student team project performance. Journal of Marketing Education, 20(1):63-71.
- Baker, B., Murphy, D. and Fisher, D. (1988). Factors Affecting Project Success. Project Management Handbook, 2nd ed. Van Norstand Reinhold Company, New York, pp. 902-919.
- Boer, H. and During, W.E. (1987). Management of process innovation – the case of FMS: a systems approach. International Journal of Production Research, 25(11):1671-1682.
- Boynton, A. and Zmud, R. (1984). An assessment of critical success factors. Sloan Management Review, 25(4):17-27.
- Cumming, B.S. (1998). Innovation overview and future challenges. European Journal of Innovation Management, 1(1):21-29.
- Davenport, T.H. (1993). Process Innovation: Reengineering Work Through Information Technology. Harvard Business School Press, Boston, Massachusetts, pp.2-3.
- Druskat, V.U. and Kayes, C.K. (2000). Learning versus performance in short-term project teams. Small Group Research, 31(3):328-353.
Details
Primary Language
Turkish
Subjects
-
Journal Section
-
Authors
İbrahim H. Seyrek
This is me
GAZİANTEP ÜNİVERSİTESİ, İKTİSADİ VE İDARİ BİLİMLER FAKÜLTESİ, İŞLETME BÖLÜMÜ
Ali E. Akgün
This is me
GEBZE YÜKSEK TEKNOLOJİ ENSTİTÜSÜ, İŞLETME FAKÜLTESİ, STRATEJİ BİLİMİ BÖLÜMÜ
Gökhan Özer
This is me
GEBZE YÜKSEK TEKNOLOJİ ENSTİTÜSÜ, İŞLETME FAKÜLTESİ, İŞLETME BÖLÜMÜ
Publication Date
June 1, 2007
Submission Date
June 1, 2007
Acceptance Date
-
Published in Issue
Year 2007 Volume: 6 Number: 1