EN
TR
HYBRID ANALTYIC SIMULATION APPROACH FOR PRODUCTION PLANNING PROBLEM WITHIN SUPPLY CHAIN NETWORK)
Öz
As the industrial environment becomes more competitive, supply chain management (SCM) has
received much more attention in the literature. The supply chain (SC) can be defined as an integrated
structure involving the procurement, production, storage, distribution and control of goods. This
paper addresses the procurement and production planning problem in a supply chain system that
involves the supply of various components from a set of suppliers and production of end products
within the plant. A linear programming model is proposed to describe the problem, where multiple
components can be assembled within a planning horizon. Due to stochastic factors such as unexpected
delays, queuing and machine failure, operation time provided by mathematical model cannot reflect
dynamic characteristic of realworld systems and optimal solution of mathematical model is not
acceptable in practice. Therefore, to explore the behaviour of the real-world system, a hybrid
mathematical-simulation approach is proposed. The applicability and flexibility of the proposed model
and approach are illustrated through an example problem.
Anahtar Kelimeler
Kaynakça
- Acar Y., Kadıpaşaoğlu, S. N., Day J. M. (2008): “Incorporating Uncertainty in Optimal Decision Making: Integrating Mixed Integer Programming and Simulation to Solve Combinatorial Problems”, Computers & Industrial Engineering, Cilt 56, No. 1, s. 106- 112.
- Acar Y., Kadıpaşaoğlu S. N., Schipperijn P. (2010): “A Decision Support Framework for Global Supply Chain Modelling: An Assessment of the Impact of Demand, Supply and Lead-Time Uncertainties on Performance”, International Journal of Production Research, Cilt 48, No. 11, s. 3245-3268.
- Arshinder K. A., Deshmukh S. G. (2008): “Supply Chain Coordination: Perspectives, Empirical Studies, and Research Directions”, International Journal of Production Economics, Cilt 115, s. 316–335.
- Bilgen B., Özkarahan I. (2004): “Strategic, Tactical and Operational Production Distribution Models: A Review”. International Journal of Technology Management, Cilt 28, s. 151– 171.
- Byrne M. D., Bakir M. A. (1999): “Production Planning Using a Hybrid Simulation- Analytical Approach”, International Journal of Production Economics, Cilt 59, No. 1, s. 305-311.
- Byrne M. D., Hossain M. M. (2005): “Production Planning: An Improved Hybrid Approach”, International Journal of Production Economics, Cilt 93-94, No. 1, s. 225-229
- Chen Z.L., Pundoor G. (2009), “Integrated order scheduling and packing, Production and Operations Management”, Cilt 18, No.6, s. 672-692.
- Gnoni, M.G., Iavagnilio, R., Mossa, G., Mummolo, G., ve Lena, A. D. (2003): “Production Planning of a Multi-Site Manufacturing System by Hybrid Modeling: A Case Study From The Automative İndustry”, International Journal Of Production Economics, Cilt 85, No. 2, s. 251-262.
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
-
Yayımlanma Tarihi
1 Eylül 2011
Gönderilme Tarihi
1 Eylül 2011
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2011 Cilt: 13 Sayı: 3
APA
Bilgen, B., & Diksirek, C. P. (2011). TEDARİK ZİNCİRİ AĞI İÇERİSİNDE ÜRETİM PLANLAMA PROBLEMİ İÇİN MELEZ ANALİTİK/BENZETİM ÇÖZÜM YAKLAŞIMI. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi, 13(3), 63-77. https://izlik.org/JA59BN36DR
AMA
1.Bilgen B, Diksirek CP. TEDARİK ZİNCİRİ AĞI İÇERİSİNDE ÜRETİM PLANLAMA PROBLEMİ İÇİN MELEZ ANALİTİK/BENZETİM ÇÖZÜM YAKLAŞIMI. DEUFMD. 2011;13(3):63-77. https://izlik.org/JA59BN36DR
Chicago
Bilgen, Bilge, ve Cansu Pınar Diksirek. 2011. “TEDARİK ZİNCİRİ AĞI İÇERİSİNDE ÜRETİM PLANLAMA PROBLEMİ İÇİN MELEZ ANALİTİK/BENZETİM ÇÖZÜM YAKLAŞIMI”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 13 (3): 63-77. https://izlik.org/JA59BN36DR.
EndNote
Bilgen B, Diksirek CP (01 Eylül 2011) TEDARİK ZİNCİRİ AĞI İÇERİSİNDE ÜRETİM PLANLAMA PROBLEMİ İÇİN MELEZ ANALİTİK/BENZETİM ÇÖZÜM YAKLAŞIMI. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 13 3 63–77.
IEEE
[1]B. Bilgen ve C. P. Diksirek, “TEDARİK ZİNCİRİ AĞI İÇERİSİNDE ÜRETİM PLANLAMA PROBLEMİ İÇİN MELEZ ANALİTİK/BENZETİM ÇÖZÜM YAKLAŞIMI”, DEUFMD, c. 13, sy 3, ss. 63–77, Eyl. 2011, [çevrimiçi]. Erişim adresi: https://izlik.org/JA59BN36DR
ISNAD
Bilgen, Bilge - Diksirek, Cansu Pınar. “TEDARİK ZİNCİRİ AĞI İÇERİSİNDE ÜRETİM PLANLAMA PROBLEMİ İÇİN MELEZ ANALİTİK/BENZETİM ÇÖZÜM YAKLAŞIMI”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 13/3 (01 Eylül 2011): 63-77. https://izlik.org/JA59BN36DR.
JAMA
1.Bilgen B, Diksirek CP. TEDARİK ZİNCİRİ AĞI İÇERİSİNDE ÜRETİM PLANLAMA PROBLEMİ İÇİN MELEZ ANALİTİK/BENZETİM ÇÖZÜM YAKLAŞIMI. DEUFMD. 2011;13:63–77.
MLA
Bilgen, Bilge, ve Cansu Pınar Diksirek. “TEDARİK ZİNCİRİ AĞI İÇERİSİNDE ÜRETİM PLANLAMA PROBLEMİ İÇİN MELEZ ANALİTİK/BENZETİM ÇÖZÜM YAKLAŞIMI”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi, c. 13, sy 3, Eylül 2011, ss. 63-77, https://izlik.org/JA59BN36DR.
Vancouver
1.Bilge Bilgen, Cansu Pınar Diksirek. TEDARİK ZİNCİRİ AĞI İÇERİSİNDE ÜRETİM PLANLAMA PROBLEMİ İÇİN MELEZ ANALİTİK/BENZETİM ÇÖZÜM YAKLAŞIMI. DEUFMD [Internet]. 01 Eylül 2011;13(3):63-77. Erişim adresi: https://izlik.org/JA59BN36DR