İnşaat projelerinde iş değişiklik emri takibi ve hak taleplerinin yönetimi üzerine bir vaka araştırması
Öz
Anahtar Kelimeler
Kaynakça
- [1] İNTES, Türkiye İnşaat Sanayicileri İşveren Sendikası, İnşaat Sektörü Raporu, 2020.
- [2] Staiti M, Othman M, Jaaron AA. Impact of change orders in construction sector in the West Bank. InInternational conference on industrial engineering and operations management 2016, pp. 1690-1698.
- [3] Hao, Qi, Weiming Shen, Joseph Neelamkavil, and Russ Thomas. "Change management in construction projects." In Proceedings of International conference on information technology in construction. 2008.
- [4] Bakr, G.A. Studying the Status of Variations in Construction Contracts in Jordan. In Computing in Civil and Building Engineering 2014, pp. 187-194.
- [5] CMAA, Construction Management Association of America, Standard CM Services and Practice. 2nd Edn., 1993, Reston, VA.
- [6] Lavigne, Joseph C. Construction Contract claims and methods of avoiding contract litigation through dispute resolution alternatives. Florida Univ Gainesville, 1993.
- [7] Levin, Paul. "Construction contract claims, changes & dispute resolution." American Society of Civil Engineers, 1998.
- [8] Nahod M.M., RadujkovicM. Procedures For Change Management İn The Realizition Phase Of Construction Projecest. Association of Researchers in Construction Management Conference, 2011, pp. 859-868.No. 10.
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
Araştırma Makalesi
Yazarlar
Betül Temel
*
Bu kişi benim
0000-0003-0472-3794
Türkiye
G. Emre Gürcanlı
Bu kişi benim
0000-0002-0807-2020
Türkiye
Senem Bilir Mahçiçek
Bu kişi benim
0000-0001-6755-7960
Türkiye
Yayımlanma Tarihi
29 Eylül 2021
Gönderilme Tarihi
13 Haziran 2021
Kabul Tarihi
24 Eylül 2021
Yayımlandığı Sayı
Yıl 2021 Cilt: 12 Sayı: 4