Towards Zero Waste in Construction: A Case Study Using Green Building Certification Systems
Abstract
In many countries of the world like Turkey there are extensive civil engineering constructions in the forms of buildings, skyscrapers, dams, bridges, canals, culverts, pipes and roads. Each one of these activities lead to wastages that need to be dealt with ecosystem friendly coupled with economic, social and environmental sustainability purposes. Construction materials from the resources through their usages and demolishment need special attention for end-product as minimum as wastage generation after reuse possibilities. The linear process of successive resources, usages and landfill end planning is the simplest alternative, which has been applied so far in any country or society, especially, by local governments and companies. Although, between usage and the landfill are interstate reuse benefits, but they are marginal, because the landfills bury large amounts of reuse benefits. Since almost ten years, circular waste treatment programs came into view with extensive consideration, which prior to landfill extracts demolishment materials as much as possible for reuse with the aim of zero waste (ZW). The application sources and possibilities of this trend is exposed for Turkish construction circles with the commercialization of more demolished materials for extra economic return. Thus, this study can be useful to policy and decision makers in developing the ZW guidelines in construction sector by using Site Waste Management Plans (SWMP)s.
Keywords
Destekleyen Kurum
Teşekkür
Kaynakça
- 1. Kaza, S., Yao, Lisa C., Bhada-Tata, P., Van Woerden, F., (2018). What a Waste 2.0: A Global Snapshot of Solid Waste Management to 2050, doi: 10.1596/978-1-4648-1329-0. Washington, DC, World Bank.
- 2. Tchobanoglous, G. and Kreith, F. (2002) Handbook of Solid Waste Management. McGraw-Hill, New York.
- 3. UK Technology Strategy Board Report, 2016, Print ISBN 9781474134378.
- 4. Ameh O.J., Itodo E.D. (2013). Professionals’ views of material wastage on construction sites and cost overruns, Org. Technol. Manage. Constr.: Int. J., 5 (1), pp. 747-757.
- 5. Mcdonald, B., & Smithers, M. (1998). Implementing a waste management plan during the construction phase of a project: A case study. Construction Management & Economics, 16 (1), 71-78. https://doi.org/10.1080/014461998372600.
- 6. EESI, (2014). How Better Recycling Can Minimize Waste and Boost the Economy, Environmental and Energy Study Institute, Washington DC.
- 7. Ekanayake L.L. Ofori , G. , (2004). Building waste assessment score: design-based tool, Build. Environ., 39 (7), pp. 851-861.
- 8. BRE, Available on URL https://www.bregroup.com/products/breeam/ (Accessed on 5.5.2019).
Ayrıntılar
Birincil Dil
İngilizce
Konular
-
Bölüm
Araştırma Makalesi
Yazarlar
Duygu Erten
*
0000-0002-9092-2417
Türkiye
Yayımlanma Tarihi
15 Haziran 2020
Gönderilme Tarihi
23 Kasım 2019
Kabul Tarihi
12 Mayıs 2020
Yayımlandığı Sayı
Yıl 2020 Cilt: 11 Sayı: 2