Case Study for Getting Probability Distributions of Some Basic Construction Activities

1 Nisan 2020
PDF İndir
TR EN

Case Study for Getting Probability Distributions of Some Basic Construction Activities

Abstract

Under the title ‘Management’, it should be considered many things simultaneously such as time, money, manpower, machinery and equipment and their interactions. After that consideration, it should have also optimized them to improve the workflow, scheduling, resource usage etc. Well, it is not easy in the uncertain environment of construction sector, which has a many stakeholder, has long completion times and is highly dependent on the human labor. It is necessary to model this uncertainty. Most importantly, we need the probability data for these models. In this study a housing project consisting of 13 floors was analyzed, the completion times of 20 activities are given for each of these floors and the distribution of the duration of each activity implemented on each floor was obtained. Those activities are repeated 13 times by the same team and with the same equipment. According to that results, activities mainly fit the Logistic, Log Logistic, Lognormal and Weibull distribution. After determining that which distribution for the activities is best suited to our data, the real time data is adjusted to this distribution and the average completion time of this activity for this building is obtained. Based on the average completion time of each activity, the completion time of the entire building was obtained. The aim was getting the stochastic data from a real project to use in different management stage in future. Besides, the number of samples will also be increased and the deviations in the resulting distributions and their causes will be examined.

Keywords

Kaynakça

  1. Avenal, A. (2014). Why Construction Project Management Should be included as a separate undergraduate Program and what topics should cover?. 4.PYYK, Eskişehir, 20.
  2. Chen, H., Ding, G. and Zhang, J. & Qin, S. (2019). Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival. Computers & Industrial Engineering, 137.
  3. Gonzalez-Ruiz, J., Peña, A., Duque, E., Patiño, A., Chiclana, F. and Góngora, M. (2019). Stochastic logistic fuzzy maps for the construction of integrated multirates scenarios in the financing of infrastructure projects. Applied Soft Computing Journal, 85.
  4. Ma, Z., Demeulemeester, E., He, Z. and Wang, N. (2019). A computational experiment to explore better robustness measures for project scheduling under two types of uncertain environments. Computers & Industrial Engineering, 131, 382–390.
  5. Creemers, S. (2019). The preemptive stochastic resource-constrained project scheduling problem. European Journal of Operational Research, 277, 238-247.
  6. Tao, S., Wu, C., Sheng, Z. and Wang, X. (2018). Stochastic Project Scheduling with Hierarchical Alternatives. Applied Mathematical Modelling, 58, 181-202.
  7. Chen, Z., Demeulemeester, E., Bai, S. and Guo Y. (2018). Efficient priority rules for the stochastic resource-constrained project scheduling problem. European Journal of Operational Research, 270, 957-967.
  8. Wanga, Y., He, Z., Kerkhove, L. and Vanhoucke, M. (2017). On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem. Computers & Industrial Engineering,114, 223-234.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Mühendislik

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

1 Nisan 2020

Gönderilme Tarihi

15 Mart 2020

Kabul Tarihi

28 Mart 2020

Yayımlandığı Sayı

Yıl 2020

Kaynak Göster

APA
Gürbüz, F., Dinç, M., & Erdinç, G. (2020). Case Study for Getting Probability Distributions of Some Basic Construction Activities. Avrupa Bilim ve Teknoloji Dergisi, 137-143. https://doi.org/10.31590/ejosat.araconf18