Strengthening the Court Management System
Project, which was initiated in 2007 jointly with the Council of Europe is a
project developed to solve the problems in judicial system. In this context, new
type of courtroom type has been established and some changes have been made with
the existing courthouse buildings of Turkey within the scope of court
management system. Some of these changes include establishment of information
desks and front offices, limited corridor system, and common use courtrooms. In
2013, an introductory book was published to facilitate the implementation of
these decisions and to introduce the new system. In this paper, new type courtroom
design is discussed and exemplified through the instances of Ordu Annex
Courthouse of Turkey and Honefoss Courthouse of Norway.
Court Management System Ordu Annex Courthouse Honefoss Courthouse Limited Corridor System Common Use Courtroom
Birincil Dil | İngilizce |
---|---|
Konular | Mimarlık |
Bölüm | Mimarlık |
Yazarlar | |
Yayımlanma Tarihi | 30 Eylül 2019 |
Gönderilme Tarihi | 27 Ağustos 2019 |
Yayımlandığı Sayı | Yıl 2019 Cilt: 7 Sayı: 3 |