In this study, a scheduling problem for unrelated parallel machines with sequence-dependent setup times, specifically in the context of tire production, is addressed. To solve this problem, a mathematical model and genetic algorithm-based matheuristic approaches have been developed. While the mathematical model provides accurate and effective solutions for small and medium scale problems, it exhibits limitations in time-constrained applications due to increased solution times for large-scale problems. In the study, two alternative matheuristic algorithms employing different crossover operators are proposed, and their ability to achieve near-optimal solutions for large-scale problems in short periods has been tested. Additionally, the classical random mutation operator was modified into a constrained random mutation operator tailored to the problem. Experimental results demonstrate that the proposed matheuristic algorithms significantly reduce solution times compared to the mathematical model, with the MA1 algorithm showing superior performance in terms of solution quality. This study offers substantial advantages in solving real-world problems by improving both solution time and quality. In the proposed matheuristic algorithm, the problem-specific chromosome structure, the initialization method for the initial population, and the constrained random mutation operator provide significant contributions to the literature for solving similar problems.

Anahtar Kelimeler

Kaynakça

  1. [1] Lin, Y.-K., Pfund, M., & Fowler, J. (2011). Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems. Computers & Operations Research, 38(6), 901-916.
  2. [2] Su, L. (2009). Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system. Computers & Operations Research, 36(2), 461-471.
  3. [3] Kongsri, P., & Buddhakulsomsiri, J. (2020). A Mixed Integer Programming Model for Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time to Minimize Makespan and Total Tardiness. 2020 IEEE 7th International Conference on Industrial Engineering and Applications (ICIEA), 605-609.
  4. [4] Diana, R. O. M., Souza, S. R., & Wanner, E. (2021). A robust multi-response VNS-aiNet approach for solving scheduling problems under unrelated parallel machines environments. Expert Systems with Applications, 182, 115140.
  5. [5] Tavakkoli-Moghaddam, R., Taheri, F., Bazzazi, M., Izadi, M., & Sassani, F. (2009). Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints. Computers & Operations Research, 36(11), 3224-3230.
  6. [6] Akyol, E., & Saraç, T. (2017). Paralel makina çizelgeleme problemi için bir karma tamsayılı programlama modeli: ortak kaynak kullanımı. Gazi University Journal of Science Part C: Design and Technology, 5(3), 109-126.
  7. [7] Safaei, S., Naderi, R., Sohrabi, A., & Hatami, A. (2015). Scheduling of unrelated parallel machines using two multi-objective genetic algorithms with sequence-dependent setup times. International Journal of Advanced Design and Manufacturing Technology, 8, 11-22.
  8. [8] Yepes-Borrero, J. C., Perea, F., Ruiz, R., & Villa, F. (2020). Bi-objective parallel machine scheduling with additional resources during setups. European Journal of Operational Research, 292(2), 443-455.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Endüstri Mühendisliği, Üretimde Optimizasyon

Bölüm

Araştırma Makalesi

Erken Görünüm Tarihi

28 Temmuz 2025

Yayımlanma Tarihi

30 Eylül 2025

Gönderilme Tarihi

16 Aralık 2024

Kabul Tarihi

20 Haziran 2025

Yayımlandığı Sayı

Yıl 2025 Cilt: 13 Sayı: 3

Kaynak Göster

APA
Ay, M. (2025). Capacity Balancing and Variation Minimization in Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Mathematical Model and Matheuristic Approach. Gazi Üniversitesi Fen Bilimleri Dergisi Part C: Tasarım ve Teknoloji, 13(3), 919-931. https://doi.org/10.29109/gujsc.1598698
AMA
1.Ay M. Capacity Balancing and Variation Minimization in Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Mathematical Model and Matheuristic Approach. GUJS Part C. 2025;13(3):919-931. doi:10.29109/gujsc.1598698
Chicago
Ay, Merhad. 2025. “Capacity Balancing and Variation Minimization in Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Mathematical Model and Matheuristic Approach”. Gazi Üniversitesi Fen Bilimleri Dergisi Part C: Tasarım ve Teknoloji 13 (3): 919-31. https://doi.org/10.29109/gujsc.1598698.
EndNote
Ay M (01 Eylül 2025) Capacity Balancing and Variation Minimization in Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Mathematical Model and Matheuristic Approach. Gazi Üniversitesi Fen Bilimleri Dergisi Part C: Tasarım ve Teknoloji 13 3 919–931.
IEEE
[1]M. Ay, “Capacity Balancing and Variation Minimization in Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Mathematical Model and Matheuristic Approach”, GUJS Part C, c. 13, sy 3, ss. 919–931, Eyl. 2025, doi: 10.29109/gujsc.1598698.
ISNAD
Ay, Merhad. “Capacity Balancing and Variation Minimization in Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Mathematical Model and Matheuristic Approach”. Gazi Üniversitesi Fen Bilimleri Dergisi Part C: Tasarım ve Teknoloji 13/3 (01 Eylül 2025): 919-931. https://doi.org/10.29109/gujsc.1598698.
JAMA
1.Ay M. Capacity Balancing and Variation Minimization in Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Mathematical Model and Matheuristic Approach. GUJS Part C. 2025;13:919–931.
MLA
Ay, Merhad. “Capacity Balancing and Variation Minimization in Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Mathematical Model and Matheuristic Approach”. Gazi Üniversitesi Fen Bilimleri Dergisi Part C: Tasarım ve Teknoloji, c. 13, sy 3, Eylül 2025, ss. 919-31, doi:10.29109/gujsc.1598698.
Vancouver
1.Merhad Ay. Capacity Balancing and Variation Minimization in Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Mathematical Model and Matheuristic Approach. GUJS Part C. 01 Eylül 2025;13(3):919-31. doi:10.29109/gujsc.1598698

                                     16168      16167     16166     21432        logo.png   


    e-ISSN:2147-9526