Araştırma Makalesi
BibTex RIS Kaynak Göster

Yıl 2025, Cilt: 14 Sayı: 5, 2271 - 2295, 31.12.2025
https://doi.org/10.15869/itobiad.1735194

Öz

Kaynakça

  • (10.02.2025). https://www.globalreporting.org/ adresinden alındı
  • (10.02.2025). https://www.kgk.gov.tr/ adresinden alındı
  • (15.03.2025a).https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/decommissioning. html#funds adresinden alındı
  • (15.03.2025b).https://www.nrc.gov/reading-rm/doc-collections/cfr/part050/part050-0075.html adresinden alındı
  • (20.04.2025).https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=US adresinden alındı
  • (15.05.2025).https://www.ecfr.gov/current/title-18/chapter-I/subchapter-B/part-35 adresinden alındı
  • (02.06.2025).https://akkuyu.com/tr/about/info adresinden alındı
  • Avrupa Parlamentosu. (2013). Nuclear Decommissioning: Management of Cost and Risks. Darmstadt: Avrupa Parlamentosu.
  • Aydemir, İ., & Deniz Başar, Ö. (2024). Türkiye'de Seçili Değişken İçerikli Bireysel Emeklilik (BES) Fonlarının Performans ve Varlık Yönetimi Analizleri. Eurasian Academy of Sciences Social Sciences Journal(52), s. 22-48.
  • Barenbold,R., Bah,M. M.,Lordan-Perret, R.,Steigerwald,B., Hirschhausen,C. v., Wealer,B., Wimmers,A. (2024). Decommissioning of Commercial Nuclear Power Plants: Insights From a Multiple-case Study. Renewable and Sustainable Energy Reviews, 201(114621), s. 1-16. doi:https://doi.org/10.1016/j.rser.2024.114621
  • Çankaya, Y. (2008). Hayat Sigortası Şirketlerinde Fon Yönetimi, Yatırım Araçları ve Ekonomiye Etkileri. İstanbul: Marmara Üniversitesi, Sosyal Bilimler Enstitüsü, İşletme Anabilim Dalı, Yüksek Lisans Tezi.
  • Hradicky, J. M., & Sabovcik, R. (2025). Decommissioning without Financial Fallout: Reforming Public Nuclear Funds. Energy Policy(206), 1-10. doi:https://doi.org/10.1016/j.enpol.2025.114723
  • Hofer, H. (2007). The Severance Pay Reform in Austria ("Abfertigung neu"). CESifo DICE Report, 05(4), s. 41-48.
  • IAEA. (2005). Financial Aspects of Decommissioning. Vienna: IAEA.
  • Irrek, W. (2019). Financing Nuclear Decommissioning. R. Haas, & vd içinde, The Technological and Economic Future of Nuclear Power (s. 139-166). Springer VS. doi:https://doi.org/10.1007/978-3-658-25987-7_7
  • Irrek, W., Müller, K., Fouquet, D., & Froggatt, A. P. (2007). Comparison Among Different Decommissioning Funds Methodologies for Nuclear Installations. Brüksel: EC-EAEC.
  • Jalili,S., Leontidis,G., Cauvin,S. R., & vd. (2024). Bottom-up Formulations for the Multi-criteria Decision Analysis of Oil and Gas Pipeline Decommissioning in the North Sea: Brent Field Case Study. Journal of Environmental Management (365), s. 1-22.
  • Laguardia, T. S. (2017). The Real Costs of Decommissioning. M. Laraia, & M. LARAIA (Dü.) içinde, Advances and Innovations in Nuclear Decommissioning (s. 91-129). Elsevier.
  • Laraia, M. (2018). Nuclear Decommissioning. Lecture Notes in Energy 66. içinde Switzerland: Springer International Publishing. doi:https://doi.org/10.1007/978-3-319-75916-6.
  • Lemasson,A. J., Somerfield,P. J., Schratzberger,M., & vd. (2024). A Global Meta-analysis of Ecological Effects from Offshore Marine Artificial Structures. Nature Sustainability, 7, s. 485-495.
  • Leeuwen, J. W. (2022, 11 22). https://www.stormsmith.nl: https://www.stormsmith.nl/ Resources/m04decom%2Bdism20190724F.pdf adresinden alındı.
  • Lordan-Perret,R., Sloan,R. D., & Rosner,R. (2021). Decommissioning the U.S. Nuclear Fleet: Financial Assurance, Corporate Structures, and Bankruptcy. Energy Policy, 154(112280), s. 1-9. doi:https://doi.org/10.1016/j.enpol.2021.112280
  • Maine State Legislature. (tarih yok). Decommissioning Trust Fun (Title 35A-Part3-Chapter43-Subchapter3). Maine.
  • Monteiro,D. B., & Moreira,J. M. (2022). Evaluation of the Decommissioning Fund for a Nuclear Power Plant in Brazil. Brazilian Journal of Radiation Sciences, 10(03B), s. 1-9.
  • Monteiro, B., D., Moreira, J. M., & Kobaiashi, G. (2024). Decommissioning Fund Evaluation Considering a Multiple Reactor Site. Nuclear Engineering and Design(416), 1-15. doi:https://doi.org/10.1016/j.nucengdes.2023.112790
  • NEA. (2003). Decommissioning Nuclear Power Plants: Policies, Strategies and Costs. Fransa:OECD NEA.
  • NEA. (2006). Decommissioning Funding: Ethics, Implementation, Uncertainties. Fransa: OECD NEA.
  • NEA.(2016). Financing the Decommissioning of Nuclear Facilities. Fransa: OECD NEA.
  • NEI.(2015). Use of the Nuclear Decommissioning Trust Fund. Washington: Nuclear Energy Institute (NEI).
  • Palma, D., Sousa, A., & Mesquita, A. (2020). Funding and Finance Issues Related to the Decommissioning of Brazilian NPPs. Brazilian Journal of Radiation Sciences(08-03A), 1-16.
  • Parente, V., Ferreira, D., Santos, E. M., & Luczynsk, E. (2006). Offshore Decommissioning Issues: Deductibility and Transferability. Energy Policy(34), 1992-2001. doi:10.1016/j.enpol.2005.02.008
  • Radyoaktif Atık Yönetimi Özel Hesabı ve İşletmeden Çıkarma Özel Hesabı ile Hesaplar Yönetim Kuruluna İlişkin Yönetmelik (2023, 14 Şubat). Resmi Gazete (Sayı: 32104). Erişim adresi:https://www.resmigazete.gov.tr/eskiler/2023/02/20230214-1.htm
  • The Commonwealth. (2022). Oil and Gas Decommissioning Toolkit Practical Guidance for Governments. Londra: Commonwealth Secretariat.
  • Wimmers,A., Barenbold, R., Bah, M. M.-P., Steigerwald, B., Hirschhausen, C. v., Weight, H., & Wealer, B. (2023). Decommissioning of Nuclear Power Plants: Regulation, Financing, and Production. Berlin: Deutsches Institut für.
  • Wimmers,A., & Hirschhausen, C. (2024). Organizational Models for the Decommissioning of Nuclear Power Plants: Lessons From the United Kingdom and the United States. Utilities Policy.
  • Yıldırım,A., & Şimşek,H. (2013). Sosyal Bilimlerde Nitel Araştırma Yöntemleri (9. Baskı b.). Ankara: Seçkin Yayıncılık.
  • Zurnacı,A. (2007). Hayat Dışı Sigorta Şirketlerinin Fon Oluşturma İmkanları ve Yönetimi Analizi. Sakarya: Sakarya Üniversitesi, Sosyal Bilimler Enstitüsü, Yüksek Lisans Tezi.

Yıl 2025, Cilt: 14 Sayı: 5, 2271 - 2295, 31.12.2025
https://doi.org/10.15869/itobiad.1735194

Öz

Kaynakça

  • (10.02.2025). https://www.globalreporting.org/ adresinden alındı
  • (10.02.2025). https://www.kgk.gov.tr/ adresinden alındı
  • (15.03.2025a).https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/decommissioning. html#funds adresinden alındı
  • (15.03.2025b).https://www.nrc.gov/reading-rm/doc-collections/cfr/part050/part050-0075.html adresinden alındı
  • (20.04.2025).https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=US adresinden alındı
  • (15.05.2025).https://www.ecfr.gov/current/title-18/chapter-I/subchapter-B/part-35 adresinden alındı
  • (02.06.2025).https://akkuyu.com/tr/about/info adresinden alındı
  • Avrupa Parlamentosu. (2013). Nuclear Decommissioning: Management of Cost and Risks. Darmstadt: Avrupa Parlamentosu.
  • Aydemir, İ., & Deniz Başar, Ö. (2024). Türkiye'de Seçili Değişken İçerikli Bireysel Emeklilik (BES) Fonlarının Performans ve Varlık Yönetimi Analizleri. Eurasian Academy of Sciences Social Sciences Journal(52), s. 22-48.
  • Barenbold,R., Bah,M. M.,Lordan-Perret, R.,Steigerwald,B., Hirschhausen,C. v., Wealer,B., Wimmers,A. (2024). Decommissioning of Commercial Nuclear Power Plants: Insights From a Multiple-case Study. Renewable and Sustainable Energy Reviews, 201(114621), s. 1-16. doi:https://doi.org/10.1016/j.rser.2024.114621
  • Çankaya, Y. (2008). Hayat Sigortası Şirketlerinde Fon Yönetimi, Yatırım Araçları ve Ekonomiye Etkileri. İstanbul: Marmara Üniversitesi, Sosyal Bilimler Enstitüsü, İşletme Anabilim Dalı, Yüksek Lisans Tezi.
  • Hradicky, J. M., & Sabovcik, R. (2025). Decommissioning without Financial Fallout: Reforming Public Nuclear Funds. Energy Policy(206), 1-10. doi:https://doi.org/10.1016/j.enpol.2025.114723
  • Hofer, H. (2007). The Severance Pay Reform in Austria ("Abfertigung neu"). CESifo DICE Report, 05(4), s. 41-48.
  • IAEA. (2005). Financial Aspects of Decommissioning. Vienna: IAEA.
  • Irrek, W. (2019). Financing Nuclear Decommissioning. R. Haas, & vd içinde, The Technological and Economic Future of Nuclear Power (s. 139-166). Springer VS. doi:https://doi.org/10.1007/978-3-658-25987-7_7
  • Irrek, W., Müller, K., Fouquet, D., & Froggatt, A. P. (2007). Comparison Among Different Decommissioning Funds Methodologies for Nuclear Installations. Brüksel: EC-EAEC.
  • Jalili,S., Leontidis,G., Cauvin,S. R., & vd. (2024). Bottom-up Formulations for the Multi-criteria Decision Analysis of Oil and Gas Pipeline Decommissioning in the North Sea: Brent Field Case Study. Journal of Environmental Management (365), s. 1-22.
  • Laguardia, T. S. (2017). The Real Costs of Decommissioning. M. Laraia, & M. LARAIA (Dü.) içinde, Advances and Innovations in Nuclear Decommissioning (s. 91-129). Elsevier.
  • Laraia, M. (2018). Nuclear Decommissioning. Lecture Notes in Energy 66. içinde Switzerland: Springer International Publishing. doi:https://doi.org/10.1007/978-3-319-75916-6.
  • Lemasson,A. J., Somerfield,P. J., Schratzberger,M., & vd. (2024). A Global Meta-analysis of Ecological Effects from Offshore Marine Artificial Structures. Nature Sustainability, 7, s. 485-495.
  • Leeuwen, J. W. (2022, 11 22). https://www.stormsmith.nl: https://www.stormsmith.nl/ Resources/m04decom%2Bdism20190724F.pdf adresinden alındı.
  • Lordan-Perret,R., Sloan,R. D., & Rosner,R. (2021). Decommissioning the U.S. Nuclear Fleet: Financial Assurance, Corporate Structures, and Bankruptcy. Energy Policy, 154(112280), s. 1-9. doi:https://doi.org/10.1016/j.enpol.2021.112280
  • Maine State Legislature. (tarih yok). Decommissioning Trust Fun (Title 35A-Part3-Chapter43-Subchapter3). Maine.
  • Monteiro,D. B., & Moreira,J. M. (2022). Evaluation of the Decommissioning Fund for a Nuclear Power Plant in Brazil. Brazilian Journal of Radiation Sciences, 10(03B), s. 1-9.
  • Monteiro, B., D., Moreira, J. M., & Kobaiashi, G. (2024). Decommissioning Fund Evaluation Considering a Multiple Reactor Site. Nuclear Engineering and Design(416), 1-15. doi:https://doi.org/10.1016/j.nucengdes.2023.112790
  • NEA. (2003). Decommissioning Nuclear Power Plants: Policies, Strategies and Costs. Fransa:OECD NEA.
  • NEA. (2006). Decommissioning Funding: Ethics, Implementation, Uncertainties. Fransa: OECD NEA.
  • NEA.(2016). Financing the Decommissioning of Nuclear Facilities. Fransa: OECD NEA.
  • NEI.(2015). Use of the Nuclear Decommissioning Trust Fund. Washington: Nuclear Energy Institute (NEI).
  • Palma, D., Sousa, A., & Mesquita, A. (2020). Funding and Finance Issues Related to the Decommissioning of Brazilian NPPs. Brazilian Journal of Radiation Sciences(08-03A), 1-16.
  • Parente, V., Ferreira, D., Santos, E. M., & Luczynsk, E. (2006). Offshore Decommissioning Issues: Deductibility and Transferability. Energy Policy(34), 1992-2001. doi:10.1016/j.enpol.2005.02.008
  • Radyoaktif Atık Yönetimi Özel Hesabı ve İşletmeden Çıkarma Özel Hesabı ile Hesaplar Yönetim Kuruluna İlişkin Yönetmelik (2023, 14 Şubat). Resmi Gazete (Sayı: 32104). Erişim adresi:https://www.resmigazete.gov.tr/eskiler/2023/02/20230214-1.htm
  • The Commonwealth. (2022). Oil and Gas Decommissioning Toolkit Practical Guidance for Governments. Londra: Commonwealth Secretariat.
  • Wimmers,A., Barenbold, R., Bah, M. M.-P., Steigerwald, B., Hirschhausen, C. v., Weight, H., & Wealer, B. (2023). Decommissioning of Nuclear Power Plants: Regulation, Financing, and Production. Berlin: Deutsches Institut für.
  • Wimmers,A., & Hirschhausen, C. (2024). Organizational Models for the Decommissioning of Nuclear Power Plants: Lessons From the United Kingdom and the United States. Utilities Policy.
  • Yıldırım,A., & Şimşek,H. (2013). Sosyal Bilimlerde Nitel Araştırma Yöntemleri (9. Baskı b.). Ankara: Seçkin Yayıncılık.
  • Zurnacı,A. (2007). Hayat Dışı Sigorta Şirketlerinin Fon Oluşturma İmkanları ve Yönetimi Analizi. Sakarya: Sakarya Üniversitesi, Sosyal Bilimler Enstitüsü, Yüksek Lisans Tezi.

Yıl 2025, Cilt: 14 Sayı: 5, 2271 - 2295, 31.12.2025
https://doi.org/10.15869/itobiad.1735194

Öz

Kaynakça

  • (10.02.2025). https://www.globalreporting.org/ adresinden alındı
  • (10.02.2025). https://www.kgk.gov.tr/ adresinden alındı
  • (15.03.2025a).https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/decommissioning. html#funds adresinden alındı
  • (15.03.2025b).https://www.nrc.gov/reading-rm/doc-collections/cfr/part050/part050-0075.html adresinden alındı
  • (20.04.2025).https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=US adresinden alındı
  • (15.05.2025).https://www.ecfr.gov/current/title-18/chapter-I/subchapter-B/part-35 adresinden alındı
  • (02.06.2025).https://akkuyu.com/tr/about/info adresinden alındı
  • Avrupa Parlamentosu. (2013). Nuclear Decommissioning: Management of Cost and Risks. Darmstadt: Avrupa Parlamentosu.
  • Aydemir, İ., & Deniz Başar, Ö. (2024). Türkiye'de Seçili Değişken İçerikli Bireysel Emeklilik (BES) Fonlarının Performans ve Varlık Yönetimi Analizleri. Eurasian Academy of Sciences Social Sciences Journal(52), s. 22-48.
  • Barenbold,R., Bah,M. M.,Lordan-Perret, R.,Steigerwald,B., Hirschhausen,C. v., Wealer,B., Wimmers,A. (2024). Decommissioning of Commercial Nuclear Power Plants: Insights From a Multiple-case Study. Renewable and Sustainable Energy Reviews, 201(114621), s. 1-16. doi:https://doi.org/10.1016/j.rser.2024.114621
  • Çankaya, Y. (2008). Hayat Sigortası Şirketlerinde Fon Yönetimi, Yatırım Araçları ve Ekonomiye Etkileri. İstanbul: Marmara Üniversitesi, Sosyal Bilimler Enstitüsü, İşletme Anabilim Dalı, Yüksek Lisans Tezi.
  • Hradicky, J. M., & Sabovcik, R. (2025). Decommissioning without Financial Fallout: Reforming Public Nuclear Funds. Energy Policy(206), 1-10. doi:https://doi.org/10.1016/j.enpol.2025.114723
  • Hofer, H. (2007). The Severance Pay Reform in Austria ("Abfertigung neu"). CESifo DICE Report, 05(4), s. 41-48.
  • IAEA. (2005). Financial Aspects of Decommissioning. Vienna: IAEA.
  • Irrek, W. (2019). Financing Nuclear Decommissioning. R. Haas, & vd içinde, The Technological and Economic Future of Nuclear Power (s. 139-166). Springer VS. doi:https://doi.org/10.1007/978-3-658-25987-7_7
  • Irrek, W., Müller, K., Fouquet, D., & Froggatt, A. P. (2007). Comparison Among Different Decommissioning Funds Methodologies for Nuclear Installations. Brüksel: EC-EAEC.
  • Jalili,S., Leontidis,G., Cauvin,S. R., & vd. (2024). Bottom-up Formulations for the Multi-criteria Decision Analysis of Oil and Gas Pipeline Decommissioning in the North Sea: Brent Field Case Study. Journal of Environmental Management (365), s. 1-22.
  • Laguardia, T. S. (2017). The Real Costs of Decommissioning. M. Laraia, & M. LARAIA (Dü.) içinde, Advances and Innovations in Nuclear Decommissioning (s. 91-129). Elsevier.
  • Laraia, M. (2018). Nuclear Decommissioning. Lecture Notes in Energy 66. içinde Switzerland: Springer International Publishing. doi:https://doi.org/10.1007/978-3-319-75916-6.
  • Lemasson,A. J., Somerfield,P. J., Schratzberger,M., & vd. (2024). A Global Meta-analysis of Ecological Effects from Offshore Marine Artificial Structures. Nature Sustainability, 7, s. 485-495.
  • Leeuwen, J. W. (2022, 11 22). https://www.stormsmith.nl: https://www.stormsmith.nl/ Resources/m04decom%2Bdism20190724F.pdf adresinden alındı.
  • Lordan-Perret,R., Sloan,R. D., & Rosner,R. (2021). Decommissioning the U.S. Nuclear Fleet: Financial Assurance, Corporate Structures, and Bankruptcy. Energy Policy, 154(112280), s. 1-9. doi:https://doi.org/10.1016/j.enpol.2021.112280
  • Maine State Legislature. (tarih yok). Decommissioning Trust Fun (Title 35A-Part3-Chapter43-Subchapter3). Maine.
  • Monteiro,D. B., & Moreira,J. M. (2022). Evaluation of the Decommissioning Fund for a Nuclear Power Plant in Brazil. Brazilian Journal of Radiation Sciences, 10(03B), s. 1-9.
  • Monteiro, B., D., Moreira, J. M., & Kobaiashi, G. (2024). Decommissioning Fund Evaluation Considering a Multiple Reactor Site. Nuclear Engineering and Design(416), 1-15. doi:https://doi.org/10.1016/j.nucengdes.2023.112790
  • NEA. (2003). Decommissioning Nuclear Power Plants: Policies, Strategies and Costs. Fransa:OECD NEA.
  • NEA. (2006). Decommissioning Funding: Ethics, Implementation, Uncertainties. Fransa: OECD NEA.
  • NEA.(2016). Financing the Decommissioning of Nuclear Facilities. Fransa: OECD NEA.
  • NEI.(2015). Use of the Nuclear Decommissioning Trust Fund. Washington: Nuclear Energy Institute (NEI).
  • Palma, D., Sousa, A., & Mesquita, A. (2020). Funding and Finance Issues Related to the Decommissioning of Brazilian NPPs. Brazilian Journal of Radiation Sciences(08-03A), 1-16.
  • Parente, V., Ferreira, D., Santos, E. M., & Luczynsk, E. (2006). Offshore Decommissioning Issues: Deductibility and Transferability. Energy Policy(34), 1992-2001. doi:10.1016/j.enpol.2005.02.008
  • Radyoaktif Atık Yönetimi Özel Hesabı ve İşletmeden Çıkarma Özel Hesabı ile Hesaplar Yönetim Kuruluna İlişkin Yönetmelik (2023, 14 Şubat). Resmi Gazete (Sayı: 32104). Erişim adresi:https://www.resmigazete.gov.tr/eskiler/2023/02/20230214-1.htm
  • The Commonwealth. (2022). Oil and Gas Decommissioning Toolkit Practical Guidance for Governments. Londra: Commonwealth Secretariat.
  • Wimmers,A., Barenbold, R., Bah, M. M.-P., Steigerwald, B., Hirschhausen, C. v., Weight, H., & Wealer, B. (2023). Decommissioning of Nuclear Power Plants: Regulation, Financing, and Production. Berlin: Deutsches Institut für.
  • Wimmers,A., & Hirschhausen, C. (2024). Organizational Models for the Decommissioning of Nuclear Power Plants: Lessons From the United Kingdom and the United States. Utilities Policy.
  • Yıldırım,A., & Şimşek,H. (2013). Sosyal Bilimlerde Nitel Araştırma Yöntemleri (9. Baskı b.). Ankara: Seçkin Yayıncılık.
  • Zurnacı,A. (2007). Hayat Dışı Sigorta Şirketlerinin Fon Oluşturma İmkanları ve Yönetimi Analizi. Sakarya: Sakarya Üniversitesi, Sosyal Bilimler Enstitüsü, Yüksek Lisans Tezi.

Decommissioning Fund and Management for Sustainability

Yıl 2025, Cilt: 14 Sayı: 5, 2271 - 2295, 31.12.2025
https://doi.org/10.15869/itobiad.1735194

Öz

This aims to plan a funding method that can facilitate the decommissioning of long-lived, environmentally impacting structures such as nuclear power plants, oil platforms, and dams at the end of their lifespan. This is being conducted using an applied research methodology through the review of working documents. Planning the fund management process for maintaining the sustainability of long-lived structures requires defining management structures, fund collection times and formats, the fund remuneration process, explanation of fund integration, and decommissioning fund payments. In this study, the decommissioning fund management planning estimate of the Akkuyu Nuclear Power Plant (ANS), which is under construction in Turkey, was attempted to be structured by taking internationally operating nuclear power plants as an example. The marketing and forecasting efforts are aimed at restructuring the decommissioning fund. The international agreement, which is the basis for the ANS system, is the amendment Türkiye undertook with the acquisition. The unit price for payment per kWh of electricity generated to the decommissioning fund to be established in Türkiye has been adopted as the decommissioning fund reference. The annual aggregate and the production approach have been considered as alternatives to the individual unit price approach. It is sensitive to three programming techniques in many respects: real rates of return, production volume, and changes in decommissioning techniques and costs. While the production factor is used in annual programming based on the total decommissioning cost, it provides programming that is more independent of production volume. As with the individual unit price approach, the imperfections of the standard unit amount of contributions to the decommissioning fund can be misleading. However, when the standard amount is determined, there will be a collection related to production. When evaluated from a production volume and quantity perspective, the unit price and production scope are more applicable.

Kaynakça

  • (10.02.2025). https://www.globalreporting.org/ adresinden alındı
  • (10.02.2025). https://www.kgk.gov.tr/ adresinden alındı
  • (15.03.2025a).https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/decommissioning. html#funds adresinden alındı
  • (15.03.2025b).https://www.nrc.gov/reading-rm/doc-collections/cfr/part050/part050-0075.html adresinden alındı
  • (20.04.2025).https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=US adresinden alındı
  • (15.05.2025).https://www.ecfr.gov/current/title-18/chapter-I/subchapter-B/part-35 adresinden alındı
  • (02.06.2025).https://akkuyu.com/tr/about/info adresinden alındı
  • Avrupa Parlamentosu. (2013). Nuclear Decommissioning: Management of Cost and Risks. Darmstadt: Avrupa Parlamentosu.
  • Aydemir, İ., & Deniz Başar, Ö. (2024). Türkiye'de Seçili Değişken İçerikli Bireysel Emeklilik (BES) Fonlarının Performans ve Varlık Yönetimi Analizleri. Eurasian Academy of Sciences Social Sciences Journal(52), s. 22-48.
  • Barenbold,R., Bah,M. M.,Lordan-Perret, R.,Steigerwald,B., Hirschhausen,C. v., Wealer,B., Wimmers,A. (2024). Decommissioning of Commercial Nuclear Power Plants: Insights From a Multiple-case Study. Renewable and Sustainable Energy Reviews, 201(114621), s. 1-16. doi:https://doi.org/10.1016/j.rser.2024.114621
  • Çankaya, Y. (2008). Hayat Sigortası Şirketlerinde Fon Yönetimi, Yatırım Araçları ve Ekonomiye Etkileri. İstanbul: Marmara Üniversitesi, Sosyal Bilimler Enstitüsü, İşletme Anabilim Dalı, Yüksek Lisans Tezi.
  • Hradicky, J. M., & Sabovcik, R. (2025). Decommissioning without Financial Fallout: Reforming Public Nuclear Funds. Energy Policy(206), 1-10. doi:https://doi.org/10.1016/j.enpol.2025.114723
  • Hofer, H. (2007). The Severance Pay Reform in Austria ("Abfertigung neu"). CESifo DICE Report, 05(4), s. 41-48.
  • IAEA. (2005). Financial Aspects of Decommissioning. Vienna: IAEA.
  • Irrek, W. (2019). Financing Nuclear Decommissioning. R. Haas, & vd içinde, The Technological and Economic Future of Nuclear Power (s. 139-166). Springer VS. doi:https://doi.org/10.1007/978-3-658-25987-7_7
  • Irrek, W., Müller, K., Fouquet, D., & Froggatt, A. P. (2007). Comparison Among Different Decommissioning Funds Methodologies for Nuclear Installations. Brüksel: EC-EAEC.
  • Jalili,S., Leontidis,G., Cauvin,S. R., & vd. (2024). Bottom-up Formulations for the Multi-criteria Decision Analysis of Oil and Gas Pipeline Decommissioning in the North Sea: Brent Field Case Study. Journal of Environmental Management (365), s. 1-22.
  • Laguardia, T. S. (2017). The Real Costs of Decommissioning. M. Laraia, & M. LARAIA (Dü.) içinde, Advances and Innovations in Nuclear Decommissioning (s. 91-129). Elsevier.
  • Laraia, M. (2018). Nuclear Decommissioning. Lecture Notes in Energy 66. içinde Switzerland: Springer International Publishing. doi:https://doi.org/10.1007/978-3-319-75916-6.
  • Lemasson,A. J., Somerfield,P. J., Schratzberger,M., & vd. (2024). A Global Meta-analysis of Ecological Effects from Offshore Marine Artificial Structures. Nature Sustainability, 7, s. 485-495.
  • Leeuwen, J. W. (2022, 11 22). https://www.stormsmith.nl: https://www.stormsmith.nl/ Resources/m04decom%2Bdism20190724F.pdf adresinden alındı.
  • Lordan-Perret,R., Sloan,R. D., & Rosner,R. (2021). Decommissioning the U.S. Nuclear Fleet: Financial Assurance, Corporate Structures, and Bankruptcy. Energy Policy, 154(112280), s. 1-9. doi:https://doi.org/10.1016/j.enpol.2021.112280
  • Maine State Legislature. (tarih yok). Decommissioning Trust Fun (Title 35A-Part3-Chapter43-Subchapter3). Maine.
  • Monteiro,D. B., & Moreira,J. M. (2022). Evaluation of the Decommissioning Fund for a Nuclear Power Plant in Brazil. Brazilian Journal of Radiation Sciences, 10(03B), s. 1-9.
  • Monteiro, B., D., Moreira, J. M., & Kobaiashi, G. (2024). Decommissioning Fund Evaluation Considering a Multiple Reactor Site. Nuclear Engineering and Design(416), 1-15. doi:https://doi.org/10.1016/j.nucengdes.2023.112790
  • NEA. (2003). Decommissioning Nuclear Power Plants: Policies, Strategies and Costs. Fransa:OECD NEA.
  • NEA. (2006). Decommissioning Funding: Ethics, Implementation, Uncertainties. Fransa: OECD NEA.
  • NEA.(2016). Financing the Decommissioning of Nuclear Facilities. Fransa: OECD NEA.
  • NEI.(2015). Use of the Nuclear Decommissioning Trust Fund. Washington: Nuclear Energy Institute (NEI).
  • Palma, D., Sousa, A., & Mesquita, A. (2020). Funding and Finance Issues Related to the Decommissioning of Brazilian NPPs. Brazilian Journal of Radiation Sciences(08-03A), 1-16.
  • Parente, V., Ferreira, D., Santos, E. M., & Luczynsk, E. (2006). Offshore Decommissioning Issues: Deductibility and Transferability. Energy Policy(34), 1992-2001. doi:10.1016/j.enpol.2005.02.008
  • Radyoaktif Atık Yönetimi Özel Hesabı ve İşletmeden Çıkarma Özel Hesabı ile Hesaplar Yönetim Kuruluna İlişkin Yönetmelik (2023, 14 Şubat). Resmi Gazete (Sayı: 32104). Erişim adresi:https://www.resmigazete.gov.tr/eskiler/2023/02/20230214-1.htm
  • The Commonwealth. (2022). Oil and Gas Decommissioning Toolkit Practical Guidance for Governments. Londra: Commonwealth Secretariat.
  • Wimmers,A., Barenbold, R., Bah, M. M.-P., Steigerwald, B., Hirschhausen, C. v., Weight, H., & Wealer, B. (2023). Decommissioning of Nuclear Power Plants: Regulation, Financing, and Production. Berlin: Deutsches Institut für.
  • Wimmers,A., & Hirschhausen, C. (2024). Organizational Models for the Decommissioning of Nuclear Power Plants: Lessons From the United Kingdom and the United States. Utilities Policy.
  • Yıldırım,A., & Şimşek,H. (2013). Sosyal Bilimlerde Nitel Araştırma Yöntemleri (9. Baskı b.). Ankara: Seçkin Yayıncılık.
  • Zurnacı,A. (2007). Hayat Dışı Sigorta Şirketlerinin Fon Oluşturma İmkanları ve Yönetimi Analizi. Sakarya: Sakarya Üniversitesi, Sosyal Bilimler Enstitüsü, Yüksek Lisans Tezi.

Sürdürülebilirlik İçin İşletmeden Çıkarma Fonu ve Yönetimi

Yıl 2025, Cilt: 14 Sayı: 5, 2271 - 2295, 31.12.2025
https://doi.org/10.15869/itobiad.1735194

Öz

Bu çalışmada nükleer santral, petrol platformu, baraj gibi uzun ömürlü ve çevreyi etkileyebilecek yapıların ömürleri sonunda işletmeden çıkarılma süreçlerini gerçekleştirebilecek fon yönteminin planlanması amaçlanmaktadır. Çalışma doküman incelemesi yoluyla uygulamalı araştırma yöntemi ile yürütülmüştür. Uzun ömürlü yapıların sürdürülebilirliğinin sağlanmasında fon yönetiminin planlanması için; yönetim yapıları, fon toplama zaman ve süreleri, fon nemalandırma süreci, fon kullanımının açıklanması ve işletmeden çıkarma fon ödemelerinin belirlenmesi gerekmektedir. İşletmeden veya hizmetten çıkarma, bu bağlamda, sürdürülebilirlik stratejilerinin etkinliği için kritik bir unsurdur. Sürdürülebilirliği sağlamada temel adımlardan biri olarak planlanan çevreci enerji yatırımları ile birlikte işletmeden çıkarma daha ön plana çıkmıştır. Sürdürülebilirlik temelli yatırım planlamasında, işletmeden çıkarma fonunun oluşturulmasına ve yönetilmesine de yer vermek artık bir zorunluluktur. Bu kapsamda Türkiye’de inşası devam eden Akkuyu Nükleer Santrali (ANS)’nin işletmeden çıkarma fon yönetimi planlaması tahmini, uluslararası faaliyette bulunan nükleer santraller örnek alınarak yapılandırılmaya çalışılmıştır. ANS’nin kuruluşuna esas uluslararası sözleşme hükümleri doğrultusunda Türkiye’nin satın alma zorunluluğu ile birlikte yüklenici işletmenin Türkiye’de kurulacak işletmeden çıkarma fonuna üretilen kWs elektrik başına ödeme yapma zorunluluğu birim fiyat temelli işletmeden çıkarma fon birikim yaklaşımı olarak işletmeden çıkarma fonu değerinin referansı olarak kabul edilmiştir. Birim fiyat temelli yaklaşıma alternatif olarak anüite temelli yaklaşım ve üretim temelli yaklaşım dikkate alınmıştır. Üç hesaplama tekniği de zamana karşı birçok açıdan hassasiyete sahiptir. Bunlar reel getiri oranları, üretim miktarı ve işletmeden çıkarma tekniklerinde ve maliyetlerinde meydana gelebilecek değişikliklerdir. İşletmeden çıkarma maliyetinin toplam tutarını baz alan anüite temelli hesaplamada üretim faktörü kullanılsa da üretim miktarından daha bağımsız bir hesaplama sağlamaktadır. Birim fiyat temelli yaklaşımda olduğu gibi işletmeden çıkarma fonuna ödenecek katkıların standart bir birim tutar üzerinden hesaplanması yanıltıcı olabilir. Ancak standart tutar belirlendiğinde işletmenin üretimi ile orantılı bir tahsilat söz konusu olacaktır. Üretim miktarı ile tutarlılık açısından değerlendirildiğinde birim fiyat ve üretim temelli yaklaşımlar daha uygulanabilirdir. Yatırımın geri dönüş süresi ve ödeme dengesi açısından değerlendirildiğinde birim fiyat temelli yaklaşım daha uygulanabilirdir.

Kaynakça

  • (10.02.2025). https://www.globalreporting.org/ adresinden alındı
  • (10.02.2025). https://www.kgk.gov.tr/ adresinden alındı
  • (15.03.2025a).https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/decommissioning. html#funds adresinden alındı
  • (15.03.2025b).https://www.nrc.gov/reading-rm/doc-collections/cfr/part050/part050-0075.html adresinden alındı
  • (20.04.2025).https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=US adresinden alındı
  • (15.05.2025).https://www.ecfr.gov/current/title-18/chapter-I/subchapter-B/part-35 adresinden alındı
  • (02.06.2025).https://akkuyu.com/tr/about/info adresinden alındı
  • Avrupa Parlamentosu. (2013). Nuclear Decommissioning: Management of Cost and Risks. Darmstadt: Avrupa Parlamentosu.
  • Aydemir, İ., & Deniz Başar, Ö. (2024). Türkiye'de Seçili Değişken İçerikli Bireysel Emeklilik (BES) Fonlarının Performans ve Varlık Yönetimi Analizleri. Eurasian Academy of Sciences Social Sciences Journal(52), s. 22-48.
  • Barenbold,R., Bah,M. M.,Lordan-Perret, R.,Steigerwald,B., Hirschhausen,C. v., Wealer,B., Wimmers,A. (2024). Decommissioning of Commercial Nuclear Power Plants: Insights From a Multiple-case Study. Renewable and Sustainable Energy Reviews, 201(114621), s. 1-16. doi:https://doi.org/10.1016/j.rser.2024.114621
  • Çankaya, Y. (2008). Hayat Sigortası Şirketlerinde Fon Yönetimi, Yatırım Araçları ve Ekonomiye Etkileri. İstanbul: Marmara Üniversitesi, Sosyal Bilimler Enstitüsü, İşletme Anabilim Dalı, Yüksek Lisans Tezi.
  • Hradicky, J. M., & Sabovcik, R. (2025). Decommissioning without Financial Fallout: Reforming Public Nuclear Funds. Energy Policy(206), 1-10. doi:https://doi.org/10.1016/j.enpol.2025.114723
  • Hofer, H. (2007). The Severance Pay Reform in Austria ("Abfertigung neu"). CESifo DICE Report, 05(4), s. 41-48.
  • IAEA. (2005). Financial Aspects of Decommissioning. Vienna: IAEA.
  • Irrek, W. (2019). Financing Nuclear Decommissioning. R. Haas, & vd içinde, The Technological and Economic Future of Nuclear Power (s. 139-166). Springer VS. doi:https://doi.org/10.1007/978-3-658-25987-7_7
  • Irrek, W., Müller, K., Fouquet, D., & Froggatt, A. P. (2007). Comparison Among Different Decommissioning Funds Methodologies for Nuclear Installations. Brüksel: EC-EAEC.
  • Jalili,S., Leontidis,G., Cauvin,S. R., & vd. (2024). Bottom-up Formulations for the Multi-criteria Decision Analysis of Oil and Gas Pipeline Decommissioning in the North Sea: Brent Field Case Study. Journal of Environmental Management (365), s. 1-22.
  • Laguardia, T. S. (2017). The Real Costs of Decommissioning. M. Laraia, & M. LARAIA (Dü.) içinde, Advances and Innovations in Nuclear Decommissioning (s. 91-129). Elsevier.
  • Laraia, M. (2018). Nuclear Decommissioning. Lecture Notes in Energy 66. içinde Switzerland: Springer International Publishing. doi:https://doi.org/10.1007/978-3-319-75916-6.
  • Lemasson,A. J., Somerfield,P. J., Schratzberger,M., & vd. (2024). A Global Meta-analysis of Ecological Effects from Offshore Marine Artificial Structures. Nature Sustainability, 7, s. 485-495.
  • Leeuwen, J. W. (2022, 11 22). https://www.stormsmith.nl: https://www.stormsmith.nl/ Resources/m04decom%2Bdism20190724F.pdf adresinden alındı.
  • Lordan-Perret,R., Sloan,R. D., & Rosner,R. (2021). Decommissioning the U.S. Nuclear Fleet: Financial Assurance, Corporate Structures, and Bankruptcy. Energy Policy, 154(112280), s. 1-9. doi:https://doi.org/10.1016/j.enpol.2021.112280
  • Maine State Legislature. (tarih yok). Decommissioning Trust Fun (Title 35A-Part3-Chapter43-Subchapter3). Maine.
  • Monteiro,D. B., & Moreira,J. M. (2022). Evaluation of the Decommissioning Fund for a Nuclear Power Plant in Brazil. Brazilian Journal of Radiation Sciences, 10(03B), s. 1-9.
  • Monteiro, B., D., Moreira, J. M., & Kobaiashi, G. (2024). Decommissioning Fund Evaluation Considering a Multiple Reactor Site. Nuclear Engineering and Design(416), 1-15. doi:https://doi.org/10.1016/j.nucengdes.2023.112790
  • NEA. (2003). Decommissioning Nuclear Power Plants: Policies, Strategies and Costs. Fransa:OECD NEA.
  • NEA. (2006). Decommissioning Funding: Ethics, Implementation, Uncertainties. Fransa: OECD NEA.
  • NEA.(2016). Financing the Decommissioning of Nuclear Facilities. Fransa: OECD NEA.
  • NEI.(2015). Use of the Nuclear Decommissioning Trust Fund. Washington: Nuclear Energy Institute (NEI).
  • Palma, D., Sousa, A., & Mesquita, A. (2020). Funding and Finance Issues Related to the Decommissioning of Brazilian NPPs. Brazilian Journal of Radiation Sciences(08-03A), 1-16.
  • Parente, V., Ferreira, D., Santos, E. M., & Luczynsk, E. (2006). Offshore Decommissioning Issues: Deductibility and Transferability. Energy Policy(34), 1992-2001. doi:10.1016/j.enpol.2005.02.008
  • Radyoaktif Atık Yönetimi Özel Hesabı ve İşletmeden Çıkarma Özel Hesabı ile Hesaplar Yönetim Kuruluna İlişkin Yönetmelik (2023, 14 Şubat). Resmi Gazete (Sayı: 32104). Erişim adresi:https://www.resmigazete.gov.tr/eskiler/2023/02/20230214-1.htm
  • The Commonwealth. (2022). Oil and Gas Decommissioning Toolkit Practical Guidance for Governments. Londra: Commonwealth Secretariat.
  • Wimmers,A., Barenbold, R., Bah, M. M.-P., Steigerwald, B., Hirschhausen, C. v., Weight, H., & Wealer, B. (2023). Decommissioning of Nuclear Power Plants: Regulation, Financing, and Production. Berlin: Deutsches Institut für.
  • Wimmers,A., & Hirschhausen, C. (2024). Organizational Models for the Decommissioning of Nuclear Power Plants: Lessons From the United Kingdom and the United States. Utilities Policy.
  • Yıldırım,A., & Şimşek,H. (2013). Sosyal Bilimlerde Nitel Araştırma Yöntemleri (9. Baskı b.). Ankara: Seçkin Yayıncılık.
  • Zurnacı,A. (2007). Hayat Dışı Sigorta Şirketlerinin Fon Oluşturma İmkanları ve Yönetimi Analizi. Sakarya: Sakarya Üniversitesi, Sosyal Bilimler Enstitüsü, Yüksek Lisans Tezi.
Toplam 37 adet kaynakça vardır.

Ayrıntılar

Birincil Dil Türkçe
Konular İşletme
Bölüm Araştırma Makalesi
Yazarlar

Vedat Ekergil 0000-0002-6790-8529

Gülbahar Uzan 0000-0003-4048-070X

Gönderilme Tarihi 4 Temmuz 2025
Kabul Tarihi 12 Aralık 2025
Yayımlanma Tarihi 31 Aralık 2025
Yayımlandığı Sayı Yıl 2025 Cilt: 14 Sayı: 5

Kaynak Göster

APA Ekergil, V., & Uzan, G. (2025). Sürdürülebilirlik İçin İşletmeden Çıkarma Fonu ve Yönetimi. İnsan ve Toplum Bilimleri Araştırmaları Dergisi, 14(5), 2271-2295. https://doi.org/10.15869/itobiad.1735194
İnsan ve Toplum Bilimleri Araştırmaları Dergisi  Creative Commons Atıf-GayriTicari 4.0 Uluslararası Lisansı (CC BY NC) ile lisanslanmıştır. 

35894