Belirsizlik altında kaynak kısıtlı çok modlu çoklu proje çizelgeleme
Öz
Anahtar Kelimeler
Kaynakça
- Ashtiani B, Leus R ve Aryanezhad M-B (2011). New competitive results for the stochastic resource-constrained project scheduling problem: Exploring the benefits of pre-processing. Journal of Scheduling. 14(2),157-171.
- Atalay K. D ve Apaydın A (2011). Şans kısıtlı stokastik programlama problemlerinin deterministik eşitlikleri. Anadolu Üniversitesi Bilim ve Teknoloji Dergisi. 1(1),1-18.
- Beşikçi U, Bilge Ü ve Ulusoy G (2013). Resource dedication problem in a multi-project environment. Flexible Services and Manufacturing Journal. 25,206–229.
- Beşikçi U, Bilge Ü ve Ulusoy G (2015). Multi-mode resource constrained multi-project scheduling and resource portfolio problem. European Journal of Operational Research. 240,22–31. doi: https://doi.org/10.1016/j.ejor.2014.06.025.
- Brucker P, Drexl A, Möhring R, Neumann K ve Pesch E (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research. 112,3–41. doi: https://doi.org/10.1016/S0377-2217(98)00204-5.
- Chakrabortty RK, Sarker RA ve Essam DL (2017). Resource constrained project scheduling with uncertain activity durations. Computers and Industrial Engineering. 112,537-550. doi: https://doi.org/10.1016/j.cie.2016.12.040.
- Charnes A ve Cooper WW (1959). Chance-constrained programming. Management Science. 6(1),73–79. doi: https://doi.org/10.1287/mnsc.6.1.73.
- Charnes A ve Cooper WW (1962). Chance constraints and normal deviates. The American Statistical Association Journal. 57,134–148.
Ayrıntılar
Birincil Dil
Türkçe
Konular
Endüstri Mühendisliği
Bölüm
Araştırma Makalesi
Yazarlar
Serdar Soysal
*
0000-0002-7093-7419
Türkiye
Berna Dengiz
0000-0002-2806-3308
Türkiye
Kumru Atalay
0000-0002-9021-3565
Türkiye
Yayımlanma Tarihi
30 Haziran 2021
Gönderilme Tarihi
27 Şubat 2021
Kabul Tarihi
27 Nisan 2021
Yayımlandığı Sayı
Yıl 2021 Cilt: 5 Sayı: 1