KAVRAMSAL BİR SİPARİŞ KABUL/RED KARAR MODELİ
Öz
Anahtar Kelimeler
Kaynakça
- [1] Weng, Z.K., "Manufacturing Lead Times, System Utilization Rates and Lead-Time-Related Demand", European Journal of Operational Research, Vol. 89, 1996, ss.259-268.
- [2] PHILIPOOM, P.R.; FRY, T.D., "Capacity-based Order Review/Release Strategies to Improve Manufacturing Performance", International Journal of Production Research, Vol. 30, No: 11, 1992, ss.2559-2572.
- [3] MERIT, D., "Bravery the Key to Job Scheduling", American Printer, Vol. 205, 1990, s.126.
- [4] MOODIE, D. R.; BOBROWSKI, P. M., "Due Date Demand Management: Negotiating the Trade-Off Between Price and Delivery", International Journal of Production Research, Vol. 37, No:5, 1999, ss.997-1021.
- [5] WESTER, F.A.W.; WIJNGAARD, J.; ZIJM, W.H.M., "Order Acceptance Strategies in a Production-to-Order Environment with Setup Times and Due-Dates", International Journal of Production Research, Vol. 30, No: 6, 1992, ss.1313-1326.
- [6] KATE, ten H. A., "Towards A Better Understanding of Order Acceptance", International Journal of Production Economics, Vol. 37, 1994, ss.139-152.
- [7] LEE, D.H.; KIM, Y.D., "Iterative Procedures for Multi-Period Order Selection and Loading Problems in Flexible Manufacturing Systems", International Journal of Production Research, Vol. 36, No: 10, 1998, ss.2653-2668.
- [8] KERN, G.M.; GUERRERO, H.H., "A Conceptual Model for Demand Management in the Assemble-to-Order Environment", Journal of Operations Management, Vol. 9, No: 1, January 1990, ss.65-84.
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
Derleme
Yazarlar
Bülent Sezen
*
Bu kişi benim
Türkiye
Yayımlanma Tarihi
30 Ocak 2002
Gönderilme Tarihi
3 Aralık 2001
Kabul Tarihi
1 Ocak 2002
Yayımlandığı Sayı
Yıl 2002 Cilt: 5 Sayı: 17