Öz

Nowadays, due to increasing fierce competition for businesses, besides efficient and productive usage of resources, it is also significant to respond customer requests on time and correctly. The purpose of this study is dynamic scheduling of orders pending for process in the shop at any time and multi orders that are currently in production in the same workshop at order-based production companies having high diversity in their product portfolio. Because of the orders that must be delivered on time, many orders wait for production process in the shop at any time and there are many orders at the workshop at the same time. This dynamic structure causes scheduling and machine loading problems which are much more complicated and it reveals the necessity of effective management of production and control processes. Incorrect scheduling or assignment causes delays in shipments and machines to be idle. In addition to this, holding raw material, semi-finished product and product inventory generates high inventory costs, shortage costs and causes performing inventory management inefficiently. To overcome all of these problems, in this paper we aim to develop dynamic scheduling application for determining product routes and operating hours by system analysis, by selecting the correct order by taking into account the shop conditions, by simulating the system to assign the correct part to machines, by determining the best relevant strategy for the company with creating kinds of scenarios

Anahtar Kelimeler

Kaynakça

  1. Aydın M.E., Öztemel E., (2000). “Dynamic Job –Shop Scheduling Using Reinforcement Learning Agents”,
  2. Robotics and Autonomous Systems, 33, 169-178. Bean, J. C., Birge, J. R., Mittenthal, J., Noon C. E. (1991). "Matchup Scheduling with Multiple Resources,
  3. Release Dates and Disruptions", Operations Research, 39/3, s. 470-483. Büyüksünetçi, A. S. (2006). Tepkin Çizelgeleme Yaklaşımının Akış Tipi Atölye Ortamında Etkinliğinin Analizi,
  4. (Basılmamış Yüksek Lisans Tezi), Osman Gazi Üniversitesi Fen Bilimleri Enstitüsü, Eskişehir, Türkiye Chang, F. C. R. (1997). "Heuristics for Dynamic Job Shop Scheduling with Real-Time Updated Queueing Time
  5. Estimates", International Journal of Production Research, 35/3, s. 651-665. Church, L. K, Uzsoy, R. (1992). "Analysis of Periodic and Event-Driven Rescheduling Policies in Dynamic
  6. Shops", International Journal of Computer Integrated Manufacturing, 5/3, s.153-163. Cowling, P., Johansson, M. (2002). "Using Real Time Information for Effective Dynamic Scheduling",
  7. European Journal of Operational Research, 139, s. 230-244. Dominic, P. D. D., Kaliyamoorthy, S., Kumar, S. (2004). "Efficient Dispatching Rules for Dynamic Job Shop
  8. Scheduling", International Journal of Advanced Manufacturing Technology, 24, s. 70-75. Elhüseyni, M. (2012) Hipotetik Bir Tekstil Atölyesinin Dinamik Çizelgelenmesinde Yollama Kurallarının

Ayrıntılar

Birincil Dil

Türkçe

Konular

-

Bölüm

-

Yazarlar

A. Türker Bu kişi benim

Yayımlanma Tarihi

1 Aralık 2016

Gönderilme Tarihi

1 Aralık 2016

Kabul Tarihi

-

Yayımlandığı Sayı

Yıl 2016 Cilt: 5 Sayı: 5

Kaynak Göster

APA
Ersoz, O., & Türker, A. (2016). Üretim Planlama ve Kontrolün Atölye Yükü ile Eşzamanlı Gerçekleştirilmesi. MANAS Sosyal Araştırmalar Dergisi, 5(5), 229-245. https://izlik.org/JA94CG43UB
AMA
1.Ersoz O, Türker A. Üretim Planlama ve Kontrolün Atölye Yükü ile Eşzamanlı Gerçekleştirilmesi. MJSS. 2016;5(5):229-245. https://izlik.org/JA94CG43UB
Chicago
Ersoz, O., ve A. Türker. 2016. “Üretim Planlama ve Kontrolün Atölye Yükü ile Eşzamanlı Gerçekleştirilmesi”. MANAS Sosyal Araştırmalar Dergisi 5 (5): 229-45. https://izlik.org/JA94CG43UB.
EndNote
Ersoz O, Türker A (01 Aralık 2016) Üretim Planlama ve Kontrolün Atölye Yükü ile Eşzamanlı Gerçekleştirilmesi. MANAS Sosyal Araştırmalar Dergisi 5 5 229–245.
IEEE
[1]O. Ersoz ve A. Türker, “Üretim Planlama ve Kontrolün Atölye Yükü ile Eşzamanlı Gerçekleştirilmesi”, MJSS, c. 5, sy 5, ss. 229–245, Ara. 2016, [çevrimiçi]. Erişim adresi: https://izlik.org/JA94CG43UB
ISNAD
Ersoz, O. - Türker, A. “Üretim Planlama ve Kontrolün Atölye Yükü ile Eşzamanlı Gerçekleştirilmesi”. MANAS Sosyal Araştırmalar Dergisi 5/5 (01 Aralık 2016): 229-245. https://izlik.org/JA94CG43UB.
JAMA
1.Ersoz O, Türker A. Üretim Planlama ve Kontrolün Atölye Yükü ile Eşzamanlı Gerçekleştirilmesi. MJSS. 2016;5:229–245.
MLA
Ersoz, O., ve A. Türker. “Üretim Planlama ve Kontrolün Atölye Yükü ile Eşzamanlı Gerçekleştirilmesi”. MANAS Sosyal Araştırmalar Dergisi, c. 5, sy 5, Aralık 2016, ss. 229-45, https://izlik.org/JA94CG43UB.
Vancouver
1.O. Ersoz, A. Türker. Üretim Planlama ve Kontrolün Atölye Yükü ile Eşzamanlı Gerçekleştirilmesi. MJSS [Internet]. 01 Aralık 2016;5(5):229-45. Erişim adresi: https://izlik.org/JA94CG43UB

MANAS Journal of Social Studies (MANAS Sosyal Araştırmalar Dergisi)     

Yayınlanan sayılar, sayı dosyaları ve makale dosyaları creative commons CC-BY-NC-ND 4.0 lisanslıdır. 

Sitemiz içerikleri ise creative commons CC-BY-NC 4.0 lisanslıdır.