ÜRETİM KAYNAKLARI PLANLAMA (ÜKP) SİSTEMİNİN PERFORMANSINI ETKİLEYEN FAKTÖRLER
Öz
Anahtar Kelimeler
Kaynakça
- Baker, K.R., 1977, An experimental study of the effectiveness of rolling schedules in production planning, Decision Sciences, 8(1), 19-27.
- Baker, K.R., and Peterson, D.W., 1979, An analytical framework for evaluating rolling schedules, Management Science, 25(4), 341-351.
- Barrett, R.T., and LaForge, R.L., 1991, A study of replanning frequencies in a material requirements planning system, Computers Operations Research, 18(6), 569-578.
- Benton, W.C., 1991, Safety stock and service levels in periodic review inventory systems, Journal of Operations Research Society, 42(12), 1087-1095.
- Benton, W.C., and Srivastava, R., 1985, Product structure complexity and multilevel lot-sizing using alternative costing policies, Decision Sciences, 16, 357-369.
- Biggs, J.R., and Champion, W.M., 1982, The effect and cost of forecast error bias for multistage production-inventory systems, Decision Sciences, 13, 570-584.
- Blackburn, J.D., and Millen, R.A., 1980, Heuristic lot-sizing performance in a rolling schedule environment, Decision Sciences, 11, 691-701.
- Blackburn, J.D., and Millen, R.A., 1982a, Improved Heuristics for multistage requirements planning systems, Management Science, 28(1), 44-56.
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
-
Yazarlar
Cenk Çalışkan
Bu kişi benim
Yayımlanma Tarihi
1 Mart 2005
Gönderilme Tarihi
12 Haziran 2015
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2005 Cilt: 10 Sayı: 1