Üretim Kaynakları Planlama (ÜKP) Sisteminin Performansını Etkileyen Faktörler

Yıl 2005, Cilt: 10 Sayı: 1, 329 - 348, 01.03.2005

Öz

Kaynakça

  • Baker, K.R., 1977, An experimental study of the effectiveness of rolling schedules in production planning, Decision Sciences, 8(1), 19-27.
  • Baker, K.R., and Peterson, D.W., 1979, An analytical framework for evaluating rolling schedules, Management Science, 25(4), 341-351.
  • Barrett, R.T., and LaForge, R.L., 1991, A study of replanning frequencies in a material requirements planning system, Computers Operations Research, 18(6), 569-578.
  • Benton, W.C., 1991, Safety stock and service levels in periodic review inventory systems, Journal of Operations Research Society, 42(12), 1087-1095.
  • Benton, W.C., and Srivastava, R., 1985, Product structure complexity and multilevel lot-sizing using alternative costing policies, Decision Sciences, 16, 357-369.
  • Biggs, J.R., and Champion, W.M., 1982, The effect and cost of forecast error bias for multistage production-inventory systems, Decision Sciences, 13, 570-584.
  • Blackburn, J.D., and Millen, R.A., 1980, Heuristic lot-sizing performance in a rolling schedule environment, Decision Sciences, 11, 691-701.
  • Blackburn, J.D., and Millen, R.A., 1982a, Improved Heuristics for multistage requirements planning systems, Management Science, 28(1), 44-56.
  • Blackburn, J.D., and Millen, R.A., 1982b, The impact of a rolling schedule in a multilevel MRP system, Journal of Operations Management, 2(2), 125-135.
  • Bookbinder, J.H., and H’ng, B.T., 1986, Rolling horizon production planning for probabilistic time-varying demands, Internatioanl Journal of Production Research, 24(6), 1439-1458.
  • Bregman, R.L., 1991a, Selecting among MRP lot-sizing methods for purchased components when the planning horizon is limited, Production and Inventory Management Journal, Q2, 32-39.
  • Bregman, R.L., 1991b, An experimental comparison of MRP purchase discount methods, Journal of Operations Research Society, 42(3), 235-245.
  • Carlson, R.C., Beckman, S.L., and Kropp, D.H., 1982, The effectiveness of extending the horizon in rolling production scheduling, Decision Sciences, 13, 129-146.
  • Carlson, R.C., Jucker, J.V., and Kropp, D.H., 1979, Less nervous MRP systems: a dynamic economic lot-sizing approach, Management Science, 25(8), 754-761.
  • Carlson, R.C., and Yano, C.A., 1986, Safety stocks in MRP—systems with emergency setups for components, Management Science, 32(4), 403-412.
  • Chand, S., 1982, A note on dynamic lot sizing in a rolling-horizon environment, Decision Sciences, 13, 113-119.
  • Chung, C., and Krajewski, L.J., 1984, Planning horizons for master production scheduling, Journal of Operations Management, 4(4), 389406.
  • Chung, C., and Krajewski, L. J., 1986, Replanning frequencies for master production schedules—notes and recommendations, Decision Sciences, 17, 263-273.
  • Çalışkan, C. ve Çelik, C., 2000, MRP,Parti Büyüklüğü, MOM, IPPA, Bitirme Ödevi, Gazi Üniversitesi Mühendislik-Mimarlık Fakültesi Endüstri Mühendisliği Bölümü, Ankara.
  • De Bodt, M.A., and Wassenhove, L.N.V., 1983, Cost increases due to demand uncertainity in MRP lot sizing, Decision Sciences, 14, 345-361.
  • Güner, E. ve Paşaoğlu, H., 1999, Bir döküm fabrikasında malzeme ihtiyaç planlama çalışması ve parti büyüklüğünün belirlenmesi, Osmangazi Üniversitesi Müh. Mim. Fak. Dergisi, XII(2), 46-58.
  • Haddock, J., and Hubicki, D.E., 1989, Which lot-sizing techniques are used in material requirements planning, Production and Inventory Management Journal, Q3, 53-56.
  • Kadıpaşaoğlu, S.N., 1995, The effect of freezing master production schedule on cost in multilevel MRP systems, Production and Inventory Management Journal, Q3, 30-36.
  • Kropp, D.H., Carlson, R.C., and Jucker, J.V., 1979, Use of dynamic lotsizing to avoid nervousness in material requirements planning systems, Production and Inventory Management Journal, Q3, 49-59.
  • Kropp, D.H., and Carlson, R.C., 1984, A lot-sizing algorithm for reducing nervousness in MRP system, Management Science, 30(2), 240-244.
  • Kunreuther, H.C., and Morton, T.E., 1973, Planning horizons for production smoothing with deterministic demands, Management Science, 20(1), 110-125.
  • Kunreuther, H.C., and Morton, T.E., 1974, General planning horizons for production smoothing with deterministic demands, Management Science, 20(7), 1037-1047.
  • Lee, T.S., and Adam, E.,E., Jr., 1986, Forecasting error evaluation in MRP production inventory systems, Management Science, 39(9), 11861205.
  • Lin, N., and Krajewski, L.J., 1992, A model for master production scheduling in uncertain environments, Decision Sciences, 23, 839-861
  • Lin, N., Krajewski, L.J., Leong, G.K., and Benton, W.C., 1994, The effects of environmental factors on the design of master production scheduling systems, Journal of Operations Management, 11, 367-384.
  • McClain, J.O., and Thomas, J., 1977, Horizon effects in aggregate production planning with seasonal demand, Management Science, 23(7), 738-746.
  • Ristroph, J.H., 1990, Simulation of ordering rules for single level MRP with a rolling horizon and no forecast error, Computers and Industrial Engineering, 19(1-4), 155-159.
  • Russell, R.A., and Urban, T.L., 1993, Horizon extension for rolling production schedules: length and accuracy requirements, International Journal of Production Economics, 29, 111-122.
  • Silver, E.A., and Meal, H.C., 1973, A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment, Production and Inventory Management, Q2, 64-74.
  • Sipper, D., and Bulfin, R.L., 1997, Production: Planning, Control and Integration, Mc Graw-Hill, New York.
  • Sridharan, V., and Berry, W.L., 1990a, Master Production Scheduling make-to-stock products: a framework for analysis, International Journal of Production Research, 28(3), 541-558.
  • Sridharan, V., and Berry, W.L., 1990b, Freezing the MPS under demand uncertainity, Decision Sciences, 21, 97-120.
  • Sridharan, V., Berry, W.L., and Udayabhanu, V., 1987, Freezing the MPS under rolling planning horizons, Management Science, 33(9), 1137-49.
  • Sridharan, V., and LaForge, R.L., 1989, The impact of safety stock on schedule instability, cost and service, Journal of Operations Management, 8(4), 327- 347.
  • Sridharan, V., and LaForge, R.L., 1994a, A model to estimate service levels when a portion of the master production schedule is frozen, Computers Operations Research, 21(5), 477-486.
  • Sridharan, V., and LaForge, R.L., 1994b, Freezing the master production schedule: implications for fill rate, Decision Sciences, 25, 461-469.
  • Vollmann, T., Berry, W., and Whybark, D., 1992, Manufacturing Planning and Control Systems, Homewood, IL:Irwin, 5-6.
  • Wemmerlov, U., 1986, A time-phase order-point system in environments with and without demand uncertainity, International Journal of Production Research, 24(2), 343-358.
  • Wemmerlov, U., and Whybark, D.C., 1984, Lot-sizing under uncertainity in a rolling schedule environment, International Journal of Production Research, 22(3), 467-484.
  • Whybark, D.C., and Williams, J.G., 1976, Material requirements planning under uncertainity, Decision Sciences, 7, 595-606.
  • Yano, C.A., and Carlson, R.C., 1985, An analysis of scheduling policies in multiechelon production systems, IIE Transactions, 17(4), 370-377.
  • Yano, C.A., and Carlson, R.C., 1987, Interaction between frequency of rescheduling and the role of safety stock in MRP systems, International Journal of Production Research, 25(2), 221-232.
  • Yeung, J.H.Y., Wong, W.C.K. and Ma L., 1998, Parameters affecting the effectiveness of MRP systems: a review, International Journal of Production Research, Vol 36(2), 313-331.
  • Zhao, X., and Lee, T.S., 1993, Freezing the MPS for MRP systems under demand uncertainity, Journal of Operations Management, 11,185-205.
  • Zhao, X., Goodale, J.C., and Lee, T.S., 1995, Lot-sizing rules and freezing the MPS in material requirements planning systems under demand uncertainity, International Journal of Production Research, 33(8), 2241-2276.
  • Zhao, X., and Lee, T.S., 1996, Freezing the master production schedule in multilevel material requirements planning systems under deterministic demand, Production Planning and Control, 7(2), 144-161.

ÜRETİM KAYNAKLARI PLANLAMA (ÜKP) SİSTEMİNİN PERFORMANSINI ETKİLEYEN FAKTÖRLER

Yıl 2005, Cilt: 10 Sayı: 1, 329 - 348, 01.03.2005

Öz

Üretim Kaynakları Planlama (ÜKP) sisteminin tasarım ve yönetimi,
rekabetin yoğun olduğu pazarlarda bulunan üretim firmaları için giderek
önem kazanmaktadır. Etkin bir ÜKP sistemi, firmaya kendi pazarında sağlam
rekabet avantajları verebilir. Bununla birlikte pazarlar, rekabet baskısı ve
teknoloji hızla değişmektedir. Bu çalışmada, ÜKP sistem performansını
etkileyen yedi önemli parametre incelenerek bu konudaki literatür gözden
geçirilmiştir.

Kaynakça

  • Baker, K.R., 1977, An experimental study of the effectiveness of rolling schedules in production planning, Decision Sciences, 8(1), 19-27.
  • Baker, K.R., and Peterson, D.W., 1979, An analytical framework for evaluating rolling schedules, Management Science, 25(4), 341-351.
  • Barrett, R.T., and LaForge, R.L., 1991, A study of replanning frequencies in a material requirements planning system, Computers Operations Research, 18(6), 569-578.
  • Benton, W.C., 1991, Safety stock and service levels in periodic review inventory systems, Journal of Operations Research Society, 42(12), 1087-1095.
  • Benton, W.C., and Srivastava, R., 1985, Product structure complexity and multilevel lot-sizing using alternative costing policies, Decision Sciences, 16, 357-369.
  • Biggs, J.R., and Champion, W.M., 1982, The effect and cost of forecast error bias for multistage production-inventory systems, Decision Sciences, 13, 570-584.
  • Blackburn, J.D., and Millen, R.A., 1980, Heuristic lot-sizing performance in a rolling schedule environment, Decision Sciences, 11, 691-701.
  • Blackburn, J.D., and Millen, R.A., 1982a, Improved Heuristics for multistage requirements planning systems, Management Science, 28(1), 44-56.
  • Blackburn, J.D., and Millen, R.A., 1982b, The impact of a rolling schedule in a multilevel MRP system, Journal of Operations Management, 2(2), 125-135.
  • Bookbinder, J.H., and H’ng, B.T., 1986, Rolling horizon production planning for probabilistic time-varying demands, Internatioanl Journal of Production Research, 24(6), 1439-1458.
  • Bregman, R.L., 1991a, Selecting among MRP lot-sizing methods for purchased components when the planning horizon is limited, Production and Inventory Management Journal, Q2, 32-39.
  • Bregman, R.L., 1991b, An experimental comparison of MRP purchase discount methods, Journal of Operations Research Society, 42(3), 235-245.
  • Carlson, R.C., Beckman, S.L., and Kropp, D.H., 1982, The effectiveness of extending the horizon in rolling production scheduling, Decision Sciences, 13, 129-146.
  • Carlson, R.C., Jucker, J.V., and Kropp, D.H., 1979, Less nervous MRP systems: a dynamic economic lot-sizing approach, Management Science, 25(8), 754-761.
  • Carlson, R.C., and Yano, C.A., 1986, Safety stocks in MRP—systems with emergency setups for components, Management Science, 32(4), 403-412.
  • Chand, S., 1982, A note on dynamic lot sizing in a rolling-horizon environment, Decision Sciences, 13, 113-119.
  • Chung, C., and Krajewski, L.J., 1984, Planning horizons for master production scheduling, Journal of Operations Management, 4(4), 389406.
  • Chung, C., and Krajewski, L. J., 1986, Replanning frequencies for master production schedules—notes and recommendations, Decision Sciences, 17, 263-273.
  • Çalışkan, C. ve Çelik, C., 2000, MRP,Parti Büyüklüğü, MOM, IPPA, Bitirme Ödevi, Gazi Üniversitesi Mühendislik-Mimarlık Fakültesi Endüstri Mühendisliği Bölümü, Ankara.
  • De Bodt, M.A., and Wassenhove, L.N.V., 1983, Cost increases due to demand uncertainity in MRP lot sizing, Decision Sciences, 14, 345-361.
  • Güner, E. ve Paşaoğlu, H., 1999, Bir döküm fabrikasında malzeme ihtiyaç planlama çalışması ve parti büyüklüğünün belirlenmesi, Osmangazi Üniversitesi Müh. Mim. Fak. Dergisi, XII(2), 46-58.
  • Haddock, J., and Hubicki, D.E., 1989, Which lot-sizing techniques are used in material requirements planning, Production and Inventory Management Journal, Q3, 53-56.
  • Kadıpaşaoğlu, S.N., 1995, The effect of freezing master production schedule on cost in multilevel MRP systems, Production and Inventory Management Journal, Q3, 30-36.
  • Kropp, D.H., Carlson, R.C., and Jucker, J.V., 1979, Use of dynamic lotsizing to avoid nervousness in material requirements planning systems, Production and Inventory Management Journal, Q3, 49-59.
  • Kropp, D.H., and Carlson, R.C., 1984, A lot-sizing algorithm for reducing nervousness in MRP system, Management Science, 30(2), 240-244.
  • Kunreuther, H.C., and Morton, T.E., 1973, Planning horizons for production smoothing with deterministic demands, Management Science, 20(1), 110-125.
  • Kunreuther, H.C., and Morton, T.E., 1974, General planning horizons for production smoothing with deterministic demands, Management Science, 20(7), 1037-1047.
  • Lee, T.S., and Adam, E.,E., Jr., 1986, Forecasting error evaluation in MRP production inventory systems, Management Science, 39(9), 11861205.
  • Lin, N., and Krajewski, L.J., 1992, A model for master production scheduling in uncertain environments, Decision Sciences, 23, 839-861
  • Lin, N., Krajewski, L.J., Leong, G.K., and Benton, W.C., 1994, The effects of environmental factors on the design of master production scheduling systems, Journal of Operations Management, 11, 367-384.
  • McClain, J.O., and Thomas, J., 1977, Horizon effects in aggregate production planning with seasonal demand, Management Science, 23(7), 738-746.
  • Ristroph, J.H., 1990, Simulation of ordering rules for single level MRP with a rolling horizon and no forecast error, Computers and Industrial Engineering, 19(1-4), 155-159.
  • Russell, R.A., and Urban, T.L., 1993, Horizon extension for rolling production schedules: length and accuracy requirements, International Journal of Production Economics, 29, 111-122.
  • Silver, E.A., and Meal, H.C., 1973, A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment, Production and Inventory Management, Q2, 64-74.
  • Sipper, D., and Bulfin, R.L., 1997, Production: Planning, Control and Integration, Mc Graw-Hill, New York.
  • Sridharan, V., and Berry, W.L., 1990a, Master Production Scheduling make-to-stock products: a framework for analysis, International Journal of Production Research, 28(3), 541-558.
  • Sridharan, V., and Berry, W.L., 1990b, Freezing the MPS under demand uncertainity, Decision Sciences, 21, 97-120.
  • Sridharan, V., Berry, W.L., and Udayabhanu, V., 1987, Freezing the MPS under rolling planning horizons, Management Science, 33(9), 1137-49.
  • Sridharan, V., and LaForge, R.L., 1989, The impact of safety stock on schedule instability, cost and service, Journal of Operations Management, 8(4), 327- 347.
  • Sridharan, V., and LaForge, R.L., 1994a, A model to estimate service levels when a portion of the master production schedule is frozen, Computers Operations Research, 21(5), 477-486.
  • Sridharan, V., and LaForge, R.L., 1994b, Freezing the master production schedule: implications for fill rate, Decision Sciences, 25, 461-469.
  • Vollmann, T., Berry, W., and Whybark, D., 1992, Manufacturing Planning and Control Systems, Homewood, IL:Irwin, 5-6.
  • Wemmerlov, U., 1986, A time-phase order-point system in environments with and without demand uncertainity, International Journal of Production Research, 24(2), 343-358.
  • Wemmerlov, U., and Whybark, D.C., 1984, Lot-sizing under uncertainity in a rolling schedule environment, International Journal of Production Research, 22(3), 467-484.
  • Whybark, D.C., and Williams, J.G., 1976, Material requirements planning under uncertainity, Decision Sciences, 7, 595-606.
  • Yano, C.A., and Carlson, R.C., 1985, An analysis of scheduling policies in multiechelon production systems, IIE Transactions, 17(4), 370-377.
  • Yano, C.A., and Carlson, R.C., 1987, Interaction between frequency of rescheduling and the role of safety stock in MRP systems, International Journal of Production Research, 25(2), 221-232.
  • Yeung, J.H.Y., Wong, W.C.K. and Ma L., 1998, Parameters affecting the effectiveness of MRP systems: a review, International Journal of Production Research, Vol 36(2), 313-331.
  • Zhao, X., and Lee, T.S., 1993, Freezing the MPS for MRP systems under demand uncertainity, Journal of Operations Management, 11,185-205.
  • Zhao, X., Goodale, J.C., and Lee, T.S., 1995, Lot-sizing rules and freezing the MPS in material requirements planning systems under demand uncertainity, International Journal of Production Research, 33(8), 2241-2276.
  • Zhao, X., and Lee, T.S., 1996, Freezing the master production schedule in multilevel material requirements planning systems under deterministic demand, Production Planning and Control, 7(2), 144-161.
Toplam 51 adet kaynakça vardır.

Ayrıntılar

Birincil Dil Türkçe
Bölüm Makaleler
Yazarlar

  Cenk Çalışkan Bu kişi benim

Yayımlanma Tarihi 1 Mart 2005
Yayımlandığı Sayı Yıl 2005 Cilt: 10 Sayı: 1

Kaynak Göster

APA Çalışkan, .C. (2005). ÜRETİM KAYNAKLARI PLANLAMA (ÜKP) SİSTEMİNİN PERFORMANSINI ETKİLEYEN FAKTÖRLER. Süleyman Demirel Üniversitesi İktisadi Ve İdari Bilimler Fakültesi Dergisi, 10(1), 329-348.