Değişken piyasalar için memetik algoritma ile sınır tenörleri eniyilemesi
Öz
Anahtar Kelimeler
Destekleyen Kurum
Etik Beyan
Kaynakça
- [1] K. F. Lane, “Choosing the optimum cutoff grade,” Colorado School of Mines quarterly, vol. 59, no. 4, pp. 811-829, 1964.
- [2] K. F. Lane, The Economic Definition of Ore, Mining Journals Books Ltd., London, UK, 1988.
- [3] E. Cetin and P. A. Dowd, “The use of genetic algorithms for multiple cut-off grade optimization,” in Proc. 30th Int. Symp. APCOM, Littleton, Colorado, USA, Apr. 11-13, 2002.
- [4] M. W. A. Asad, “Optimum cut-off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation. Engineering Computations, vol. 24, no. 7, pp. 723-736, 2007.
- [5] M. W. A. Asad and E. Topal, “Net present value maximization model for optimum cut-off grade policy of open pit mining operations,” Journal of the SAIMM, vol. 111, no. 11, pp. 741–750, 2011.
- [6] J. Gholamnejad, “Determination of the optimum cutoff grade considering environmental cost,” J. Int. Environmental Application & Science, vol. 3, no. 3, pp. 186-194, 2008.
- [7] J. Gholamnejad, “Incorporation of rehabilitation cost into the optimum cut-off grade determination,” Journal of the SAIMM, vol. 109, no. 2, pp. 89-94, 2009.
- [8] Y. Azimi, M. Osanloo, and A. Esfahanipour, “Selection of the open pit mining cut-off grade strategy under price uncertainty using a risk based multi-criteria ranking system,” Archives of Mining Sciences, vol. 57, no. 3, pp. 741-768, 2012.
Ayrıntılar
Birincil Dil
Türkçe
Konular
Maden Tasarımı, İşletme ve Ekonomisi , Madencilik Yöntemleri ve Maden Sistem Analizi , Metalik Madenler
Bölüm
Araştırma Makalesi
Yazarlar
Erhan Çetin
*
0000-0003-0053-6932
Türkiye
Erken Görünüm Tarihi
30 Eylül 2025
Yayımlanma Tarihi
30 Eylül 2025
Gönderilme Tarihi
8 Mayıs 2025
Kabul Tarihi
25 Haziran 2025
Yayımlandığı Sayı
Yıl 2025 Cilt: 16 Sayı: 3