Yeşil Binalar için Analitik Ağ Süreci (AAS) Kullanılarak Yüklenici Seçimi
Öz
Anahtar Kelimeler
Kaynakça
- Bu-Qammaz, A. S., I. Dikmen, & M. T. Birgonul. (2009). Risk assessment of international construction projects using the analytic network process, Can. J. Civ. Eng., 36(7), 1170-1181.
- Cao, X., D. Xilei, & J. Liu. (2016). Building energy-consumption status worldwide and the state-of-the-art technologies for zero-energy buildings during the past decade, Energy and Buildings, 128:198-213.
- Cheng, E., & H. Li. (2004). Contractor selection using the analytic network process, Constr. Manage. Econ., 22(10):1021–1032.
- Dikmen, I., M. T. Birgonul, & B. Ozorhon. (2007). Project appraisal and selection using the analytic network process, Can. J. Civ. Eng., 34(7):786–792.
- Do, S. T., V. Likhitruangsilp, T. T. Kiet, & P. T. Nguyen. (2017). Risk assessment for international construction joint ventures in Vietnam, International Journal of Advanced and Applied Sciences, 4(6):104-114.
- El-Abbasy, M. S., T. Zayed, M. Ahmed, H. Alzraiee, & M. Abouhamad. (2013). Contractor selection model for highway projects using integrated simulation and analytic network process, J. Constr. Eng. Manage., 139 (7): 755–767.
- Erdem, D., & B. Ozorhon. (2015). Assessing Real Estate Project Success Using an Analytic Network Process, Journal of Management in Engineering, 31(4):04014065.
- Hasnain, M., M. J. Thaheem, & F. Ullah. (2018). Best Value Contractor Selection in Road Construction Projects:ANP-Based Decision Support System, Int. J. Civ. Eng., 16:695–714.
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
Araştırma Makalesi
Yazarlar
Emre Caner Akçay
*
Türkiye
Yayımlanma Tarihi
30 Eylül 2020
Gönderilme Tarihi
19 Aralık 2019
Kabul Tarihi
22 Haziran 2020
Yayımlandığı Sayı
Yıl 2020 Cilt: 11 Sayı: 3