Testing and Characterization of FBE+ARO Dual Layer Coatings of Welded Steel Pipes
Öz
Anahtar Kelimeler
Kaynakça
- [1] H. Liu, Pipeline engineering. CRC Press, 2003.
- [2] M. Stewart, ‘‘Surface production operations facility piping and pipeline systems: Vol. 3,’’ 2016.
- [3] P. Ellenberger, Piping and pipeline calculations manual: construction, design fabrication and examination. Elsevier, 2014.
- [4] A. Dinita and S. Kolisnychenko, Corrosion. Tube Products and Pipeline Systems. Trans Tech Publications Ltd, 2021.
- [5] D. Kuang and F. Cheng, ‘‘Coating degradation in the presence of alternating current interference,’’ in NACE CORROSION. NACE, 2016.
- [6] W. K. Muhlbauer, Pipeline risk management manual: ideas, techniques, and resources. Elsevier, 2004.
- [7] E. S. Menon, Pipeline planning and construction field manual. Gulf Professional Publishing, 1978.
- [8] Y. Bai and Q. Bai, Subsea pipeline integrity and risk management. Gulf Professional Publishing, 2014.
Ayrıntılar
Birincil Dil
İngilizce
Konular
Mühendislik Uygulaması
Bölüm
Araştırma Makalesi
Yazarlar
Erman Ferik
*
0000-0002-9694-5732
Türkiye
Semih Ozbey
0000-0001-5582-9973
Türkiye
Gökhan Çil
0000-0003-0924-3984
Türkiye
Mahmut Gel
0000-0002-8384-4932
Türkiye
Yayımlanma Tarihi
1 Mayıs 2025
Gönderilme Tarihi
1 Mart 2024
Kabul Tarihi
11 Temmuz 2024
Yayımlandığı Sayı
Yıl 2025 Cilt: 12 Sayı: 2


