Optimization of Project Scheduling Activities in Dynamic CPM and PERT Networks Using Genetic Algorithms
Öz
Anahtar Kelimeler
Kaynakça
- [1] Yildiz, S. 2001. Resource Leveling and Earned Value Analysis in Project Management: an Application in Construction Sector, Master Thesis, Baskent University Institute of Social Sciences, Ankara, 7-37.
- [2] Sivri, G. 2001. Monitoring and controlling progress in construction projects and an application for project information management system, Master Thesis, Istanbul Technical University Institute of Social Sciences, Istanbul, 1-48.
- [3] Kutlu, N. T. 2001. Project planning techniques and a study on application of PERT technique in construction sector, Dokuz Eylul University Journal of Social Sciences Institute, Izmir, 3 (2): 164-207.
- [4] Duncan, W. R. 1996. A Guide to the Project Management Body of Knowledge, Project Management Institute, USA, 3-27.
- [5] Ozdemir, G. 2006. The genetic algorithm methods used in resource constrained project scheduling problems and their comparison, Master Thesis, Ankara University Institute of Social Sciences.
- [6] Hoscan, Y. 1988. Package programs developed for CPM/PERT methods and solution used to check the project, Anadolu University, Eskisehir.
- [7] Leu, S. S., & Yang, C. H. 1999. A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management & Economics, 17(6), 767-776.
- [8] Deb, K. 2001. Multi-objective optimization using evolutionary algorithms (Vol. 16). John Wiley & Sons.
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
-
Yayımlanma Tarihi
15 Ağustos 2018
Gönderilme Tarihi
12 Şubat 2018
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2018 Cilt: 22 Sayı: 2