avatar
Savaş Bayram Assoc. Prof. Dr. Erciyes University, Faculty of Engineering
Publication 18 Review 17 CrossRef Cited 12 TR Dizin Cited 11
18 Publication
17 Review
12 CrossRef Cited
11 TR Dizin Cited

Research Fields

Construction Business Project Management

Institution

Erciyes University, Faculty of Engineering

Popular Publications

Reference Class Forecasting Method in Predicting Construction Project Duration
Authors: Savaş Bayram , Saad Al-jıbourı
DOI: 10.19113/sdufenbed.469288
CITED 2 FAVORITE 1 TOTAL DOWNLOAD COUNT 1372

2

1

1372

0

1

1564

1

1

1198

Publications

0

201

1

1198

1

1564

Occupational Expectations and Career Plans of Civil Engineering Students
Authors: Serkan Aydınlı , Gözde Tantekin Çelik, Savaş Bayram , Emel Oral
Published: 2020 , Yükseköğretim Dergisi
DOI: 10.2399/yod.19.012
FAVORITE 0 TOTAL DOWNLOAD COUNT 650

0

650

0

2419

Reference Class Forecasting Method in Predicting Construction Project Duration
Authors: Savaş Bayram , Saad Al-jıbourı
DOI: 10.19113/sdufenbed.469288
FAVORITE 1 TOTAL DOWNLOAD COUNT 1372

1

1372

Trend Analysis of Final Construction Prices: The Turkish Case
DOI: 10.30931/jetas.442642
FAVORITE 0 TOTAL DOWNLOAD COUNT 816

0

816

0

2162

Comparison of Unit Price Method and Unit Area Cost Method for Construction Cost Estimation
Authors: Savaş Bayram , M. Emin Öcal, Emel Laptalı Oral, C. Duran Atiş
Published: 2016 , Politeknik Dergisi
DOI: -
FAVORITE 0 TOTAL DOWNLOAD COUNT 9172

0

9172

0

2056

LEGISLATION OF CONSTRUCTION WASTE CONCEPT AND A CASE STUDY AT A READY MIXED CONCRETE PLANT
Authors: Savaş Bayram , Mehmet Emin Öcal, Emel Laptalı Oral
Published: 2012 , Engineering Sciences
DOI: -
FAVORITE 0 TOTAL DOWNLOAD COUNT 2363

0

2363

Publications

1

0

201

1

1

1198

Occupational Expectations and Career Plans of Civil Engineering Students
Authors: Serkan Aydınlı , Gözde Tantekin Çelik, Savaş Bayram , Emel Oral
Published: 2020 , Yükseköğretim Dergisi
DOI: 10.2399/yod.19.012
CITED 2 FAVORITE 0 TOTAL DOWNLOAD COUNT 650

2

0

650

Reference Class Forecasting Method in Predicting Construction Project Duration
Authors: Savaş Bayram , Saad Al-jıbourı
DOI: 10.19113/sdufenbed.469288
CITED 2 FAVORITE 1 TOTAL DOWNLOAD COUNT 1372

2

1

1372

5

0

2162

1

0

2056

Interactive Guide Tool